Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Adani Power Receives LoA for the 2,400 MW Greenfield Thermal Power Plant in Bihar
Renewable energy

Adani Power Receives LoA for the 2,400 MW Greenfield Thermal Power Plant in Bihar

PrakashBy PrakashAugust 29, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Adani Group to Invest ₹63,000 Crore in Assam

Adani Power Ltd., India’s largest private sector thermal power generator, said it has received a Letter of Award (LoA) for 25 Years long-term procurement of electricity from Bihar State Power Generation Company Ltd. (BSPGCL), which it will supply from a 2,400 MW (800 MW X 3) greenfield ultra-supercritical plant to be set up at Pirpainti in the Bhagalpur district of Bihar.

BSPGCL awarded the LoA to APL on behalf of North Bihar Power Distribution Company Ltd. (NBPDCL) and South Bihar Power Distribution Company Ltd. (SBPDCL), the two state utilities. This would be followed by the signing of the Power Supply Agreement (PSA) between the entities.

India’s power demand is expected to grow rapidly in the coming years, with peak demand rising from the current ~250 GW to ~400 GW by 2031-32, and 700+ GW by 2047, propelled by rapid industrialization, urbanization, and a growing population. Thermal power, with its inherent ability to provide large-scale, reliable, and round-the-clock power, will continue to remain the backbone of our energy security, providing critical base-load and grid-balancing support. To meet this ever-increasing power demand, the government has envisaged an additional ~100 GW of thermal capacity to be added by 2035.

“Adani Power, as India’s largest private sector thermal power producer, has consistently demonstrated the capability to deliver dependable capacity at scale,” said Mr. S.B. Khyalia, Chief Executive Officer of Adani Power. “With our upcoming ultra-supercritical, high-efficiency Pirpainti project in Bihar, we are setting new benchmarks in operational excellence and sustainability. This plant will provide affordable and uninterrupted power to the people of Bihar, catalyzing industrialization, strengthening the state’s economy, and supporting the prosperity of its people. Through projects such as this, Adani Power remains committed to playing a leading role in securing India’s energy future.”

Earlier, Adani Power had emerged as the winner in a tightly contested Tariff Based Competitive Bidding process called by BSPGCL, offering the lowest supply price of Rs 6.075 per KWh. The company will invest ~$3 billion in setting up the plant and the related infrastructure.

The project will generate direct and indirect employment of ~10,000–12,000 during the construction phase and ~3,000 once in operation.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Adani Power BSPGCL energy security Letter of Award
Prakash
  • Website
  • LinkedIn

I am a Junior Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

Comments are closed.

Renewable energy
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Kyro Capital

Kyro Capital Launches ₹100 Crore Pre-IPO Fund Targeting Renewable Energy and Growth Sectors

June 3, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.