Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Bondada Engineering Commissions 120.46 MWp Solar Projects, Strengthens Renewable Energy Portfolio
Renewable energy

Bondada Engineering Commissions 120.46 MWp Solar Projects, Strengthens Renewable Energy Portfolio

ManshiBy ManshiJanuary 6, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Bondada Engineering Commissions 120.46 MWp Solar Projects, Strengthens Renewable Energy Portfolio

Bondada Engineering has successfully commissioned solar projects totaling 120.46 MWp during December 2025 for Paradigm IT, MAHAGENCO, and NLC India across multiple project clusters in Dhule, Amaravati, Hingoli, Pathardi, Shevgaon, Kannad, and Dharni in Maharashtra, and Neyveli in Tamil Nadu.

Notably, the company has doubled its monthly commissioning volumes on a month-on-month basis over the last two consecutive months, reflecting strong execution momentum, enhanced project management capabilities, and improved operational efficiencies within the solar EPC segment, the company stated.

“This achievement represents a significant milestone in Bondada Engineering’s contribution to India’s National Renewable Energy Mission, reinforcing our role as a reliable EPC partner in the country’s clean energy transition,” the company added.

The Solar Division demonstrated high levels of technical expertise, disciplined execution, and adherence to stringent quality and safety standards, ensuring seamless delivery as per customer expectations.

In December 2025, Bondada Engineering also secured several major orders:

  • INR 627 crore LOA from AP TRANSCO for a 225 MW/450 MWh standalone BESS project at Hindupur, Andhra Pradesh.
  • INR 391.38 crore BOS EPC order from NTPC Green Energy for a 300 MW solar project in Lalitpur, Uttar Pradesh.
  • INR 945.11 crore BOS order from NLC India Renewables for 810 MW of solar projects at RVUNL Solar Park, Bikaner, Rajasthan.

Earlier, in November 2025, the company entered a five-year partnership with Adani Group to develop large-scale solar projects across India, starting with a 650 MW project at Khavda Renewable Energy Park, Gujarat. It also received a 100 MW project LOA from MAHAGENCO for a solar power plant in Maharashtra worth INR 465 crore.

In H1 FY26, Bondada Engineering reported revenue of INR 1,216 crore, a 153% rise, with PAT at INR 92.56 crore, up 151% year-on-year. The renewable energy segment contributed INR 955 crore, accounting for 78% of total revenue. BEL’s order book now stands at INR 5,989 crore, supported by ongoing and upcoming projects across renewable energy, telecom, railways, BESS, and manufacturing.

This combination of timely project execution, strong order inflow, and financial growth positions Bondada Engineering as a key player in India’s renewable energy sector, demonstrating both operational excellence and long-term growth momentum.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Adani Group Bondada Engineering clean energy India News NLC India renewable energy solar projects
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.