Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Bondada Engineering Secures ₹627 Crore AP TRANSCO Battery Energy Storage Project in Andhra Pradesh
Batteries

Bondada Engineering Secures ₹627 Crore AP TRANSCO Battery Energy Storage Project in Andhra Pradesh

ManshiBy ManshiJanuary 5, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
Bondada Engineering Secures ₹627 Crore AP TRANSCO Battery Energy Storage Project in Andhra Pradesh

Bondada Engineering Limited has marked a major milestone in its renewable energy journey after receiving a Letter of Award (LOA) from the Transmission Corporation of Andhra Pradesh Limited (AP TRANSCO) for the development of a large-scale standalone Battery Energy Storage System (BESS). The award, disclosed through a regulatory filing under SEBI Regulation 30, significantly strengthens the company’s presence in India’s fast-evolving energy storage and grid infrastructure sector.

The project entails the establishment of a 225 MW / 450 MWh standalone battery energy storage system at the 400/220 kV Hindupur substation in Anantapur district, Andhra Pradesh. It will be executed under the Build–Own–Operate (BOO) model, allowing Bondada Engineering to own, operate, and maintain the asset over its lifecycle. This approach enables the company to generate stable, long-term annuity-based revenues, offering enhanced earnings visibility and predictable cash flows.

Valued at approximately ₹627 crore, the project is expected to be completed within 18 months from the date of receipt of the LOA. Upon commissioning, the facility will play a critical role in supporting grid stability, managing peak power demand, and enabling greater integration of renewable energy sources into the state’s electricity network. Battery energy storage systems are increasingly becoming a key enabler of India’s clean energy transition, helping address intermittency challenges associated with renewable power generation.

With the addition of this project, Bondada Engineering’s cumulative BESS portfolio has reached nearly 1 GWh, positioning the company as a strong and credible participant in India’s grid-scale energy storage ecosystem. This expansion reflects the company’s strategic shift from a predominantly construction-led revenue model toward an operational annuity-based framework, which is expected to improve long-term shareholder value and strengthen financial resilience.

The company stated that the project has been awarded by a domestic entity and does not involve any promoter or group company interest, confirming that it is not a related-party transaction. This ensures transparency and compliance with regulatory requirements.

This latest project win aligns closely with India’s broader energy transition goals, particularly the push toward energy storage-led infrastructure development to support rising renewable energy capacity. The Hindupur BESS project is expected to contribute significantly to Andhra Pradesh’s power system reliability while enhancing the state’s renewable energy integration capabilities.

Overall, the AP TRANSCO project represents a key step forward in Bondada Engineering Limited’s growth strategy, reinforcing its capability to secure and execute large-scale, complex infrastructure projects in the emerging energy storage segment while strengthening its long-term growth visibility in India’s clean energy landscape.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Battery Energy Storage System Bondada Engineering Limited energy storage renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.