Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Datta Power Infra Appoints Veerender Kumar as Head of Project Management Office
Renewable energy

Datta Power Infra Appoints Veerender Kumar as Head of Project Management Office

PrakashBy PrakashAugust 12, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Datta Power Infra appoints Veerender Kumar as Head of PMO to lead scalable planning and enhance project execution in renewable energy.

Datta Power Infra Private Limited (Datta Infra) has announced the appointment of Veerender Kumar as Head of the Project Management Office (PMO). With over 20 years of experience in solar EPC, transmission, and infrastructure development, Veerender joins the company as Datta Infra accelerates its growth in the renewable energy sector across India.

Veerender has earned the reputation over the years of being able to transform complex project pipelines into engineered highly precise delivery pipelines. At Datta Infra, he will work on ensuring that his major work is developing scalable planning systems and strengthening performance management among all project activities.

Reflecting on the strategic hire, Varchasvi Gagal, Managing Director and CEO of Datta Infra, shared: “In infrastructure, scale means nothing without control. Veerender brings not just depth of experience, but a rare ability to build order out of complexity. His presence strengthens our commitment to execution excellence and to delivering projects that are not just fast but flawless.”

Speaking on his new role, Veerender Kumar, Head – Project Management Office, said, “As we step into a new phase of accelerated growth, my focus will be on creating systems that anticipate challenges, not just respond to them. From procurement to site execution, it’s about enabling tighter, smarter coordination that delivers impact at scale.”

Veerender was previously working as GM PMO in Avaada energy with the role of scheduling and delivery governance of high capacity solar projects. He had spent 15 years at a company named Sterling & Wilson Renewable Energy whereby he had been an Engineer and then a Deputy GM-PMO whereby he had led the key India projects.

A diploma holder in Electrical Engineering, Veerender is credited with an analytical understanding concerning implementation, manufacturer ecosystem and data-based performance models.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Executive Appointment renewable energy
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

Comments are closed.

Renewable energy

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

October 16, 2026
NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

October 16, 2026
Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

October 16, 2026
Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

October 16, 2026
Batteries
Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

October 16, 2026

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

October 16, 2026
Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

October 16, 2026
NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

October 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.