Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » DNV to Oversee Egypt’s Abydos 2 Solar-Plus-Storage Project for AMEA Power
Batteries

DNV to Oversee Egypt’s Abydos 2 Solar-Plus-Storage Project for AMEA Power

PrakashBy PrakashJune 19, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
DNV supports AMEA Power’s Abydos 2 solar-plus-storage project in Egypt with end-to-end engineering oversight.

As Owner’s Engineer, DNV is set to support the Abydos 2 project from feasibility and design review through to construction supervision and commissioning oversight. Located in a desert environment, the project faces a range of technical and environmental challenges—from extreme temperatures and dust accumulation to complex grid integration requirements. DNV draws on deep technical expertise, global best practices, and local insight to help deliver the project safely, efficiently, and in line with regulatory expectations.

Headquartered in Dubai, AMEA Power develops, invests in, owns, and operates renewable energy projects across Africa, the Middle East, and emerging Asia. With projects in over 20 countries and a growing pipeline of wind, solar, energy storage, and green hydrogen initiatives, the company is steadily expanding its footprint in support of the global energy transition. The AFRE project reflects AMEA Power’s mission to accelerate energy access and sustainability in fast-growing economies.

“Projects of this scale demand both technical rigor and regional insight. Our role is to safeguard performance and reliability from day one, helping AMEA Power deliver an asset that is robust, future-ready, and aligned with Egypt’s long-term energy goals.”

– Santiago Blanco, Executive Vice President and Regional Director for the Middle East at DNV.

Addressing the complexities of Solar-Plus-Storage in harsh environments

DNV’s technical support spans three core pillars:

  • Design resilience: guiding technology selection and plant layout to ensure performance in hot, arid conditions.
  • Grid compliance: reviewing advanced simulations to meet interconnection codes and maintain system stability.
  • Battery safety: applying DNV’s globally recognized BESS safety standards for fire prevention, thermal management, and operational integrity.

A model for emerging markets

The project will decarbonize Egypt’s energy mix and create approximately 4,000 construction jobs, demonstrating the dual climate and socioeconomic value of solar-plus-storage in emerging markets.

DNV’s advisory services help maximize this value through:

  • Quality assurance: on-site monitoring to ensure construction quality and minimize delays.
  • Performance guarantees: testing and validation aligned with international benchmarks.
  • Knowledge transfer: empowering AMEA Power with best practices for future projects.

“Large-scale renewable projects like Abydos 2 are essential to delivering on Egypt’s Vision 2035. The energy transition is no longer a distant goal—it’s an urgent priority. Our role is to bridge strategy and implementation, helping turn ambition into reality by enabling clean energy systems that are technically sound, financially viable, and built to last for generations.”

– Santiago Blanco, Executive Vice President and Regional Director for the Middle East at DNV.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
solar energy solar plus storage system Wind Energy
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.