The Battery Magazine Logo

Subscribe to The Battery Magazine's Current Newsletter & never miss an update!

    Close Menu
    The Battery MagazineThe Battery Magazine
    • Home
    • Batteries
      • EV & Automotive
      • Portable Power
      • Stationary & Industrial
    • Articles
    • Charging
    • Manufacturing
    • Renewable
    • Hydrogen
    • Tenders
      • Energy Storage Tender
      • Renewable Tender
    • Events
    • E-Mag
    Facebook LinkedIn WhatsApp
    The Battery MagazineThe Battery Magazine
    • Home
    • Batteries
      • EV & Automotive
      • Portable Power
      • Stationary & Industrial
    • Articles
    • Charging
    • Manufacturing
    • Renewable
    • Hydrogen
    • Tenders
      • Energy Storage Tender
      • Renewable Tender
    • Events
    • E-Mag
    LinkedIn Facebook WhatsApp
    The Battery MagazineThe Battery Magazine
    Home » EDP Renewables North America Sign 20-Year PPA with California Water Service for Onsite Solar Project

    EDP Renewables North America Sign 20-Year PPA with California Water Service for Onsite Solar Project

    PrakashBy PrakashJuly 24, 2025Updated:July 30, 2025 Renewable 2 Mins Read
    Facebook Twitter LinkedIn WhatsApp
    Cal Water and EDPR NA DG sign a 20-year agreement for an onsite solar project in Bakersfield to boost sustainability and cut energy costs.

    EDPR NA Distributed Generation LLC (EDPR NA DG), the distributed generation business of EDP Renewables North America LLC (EDPR NA), and California Water Service (Cal Water) have signed a 20-year power purchase agreement (PPA) for a 1.75 MWac/2.35 MWdc onsite solar photovoltaic (PV) array at Cal Water’s Northeast Bakersfield Treatment Plant. The partnership is designed to reduce the utility’s long-term environmental footprint.

    Cal Water and EDPR NA DG expect the system to generate approximately 3,800 megawatt-hours of renewable energy annually. The renewable energy generated by the solar array is anticipated to reduce grid energy costs by approximately $1.7 million over the term of the agreement, based on current electric rates for customers in the Bakersfield District, one of Cal Water’s largest service areas.

    “At Cal Water, we are dedicated to being a responsible environmental steward, and partnering with EDPR NA DG will help us reduce traditional power costs, reach our science-aligned greenhouse gas emissions reduction targets, and increase sustainability,” said Marty Kropelnicki, Cal Water Chairman and CEO. “We look forward to bringing this new onsite solar array online, which is an important step for us to continue providing safe, reliable, and affordable water service to our customers for decades to come.”

    “California is a national clean energy leader because of organizations like Cal Water, which prioritize supporting renewable energy investments,” said João Barreto, EDPR NA Distributed Generation CEO. “This partnership demonstrates the ever-increasing convergence of the water-energy nexus and the importance of investment in vital infrastructure throughout California.”

    EDPR NA and EDPR NA DG have been actively engaged in California for more than two decades, developing utility-scale and distributed-scale solar projects to support the state’s growing energy demand. EDPR NA operates 1,138 MW of clean energy assets in California, powering the equivalent of 451,000 homes. EDPR NA DG’s portfolio in California spans more than 180 projects, including 75 MWac/81 MWdc in operation. In May 2024, EDPR NA announced the completion of the 200 MW Scarlet II Solar Energy Park in Fresno County, California. Scarlet II follows EDPR NA’s Scarlet I Solar Energy Park (Scarlet I), consisting of 200 MW of solar and 40 MW/160 MWh of battery energy storage system (BESS), which achieved commercial operation in 2024.

    Cal Water EDPR NA lower energy costs solar project
    Prakash

    More article from Prakash

    Keep Reading

    Servotech Secures 7.3 MW On-Grid Solar Rooftop Order

    India Reaches 187.87 GW Renewable Energy Capacity, Driving Clean Energy Leadership

    Sungrow Launches High-Efficiency Micro Inverters for India’s Rooftop Solar Market

    Comments are closed.

    MANUFACTURING & MATERIALS

    eJoule Supplies Wyon Swiss Batteries High Performance Single Crystal Cathode Active Material

    August 7, 2025

    LG Energy Solution Reports Robust Q2 2025 Performance

    July 25, 2025

    Lucid Launches MINAC Partnership to Boost U.S. EV Mineral Supply Chain

    July 24, 2025

    Himadri Eyes Larger Sicona Stake to Boost EV Battery Tech

    July 23, 2025
    Batteries

    GIZ, TERI, and GUVNL Join Forces to Pilot Energy Storage Solutions Boosting India’s Renewable Grid

    August 20, 2025

    Sungrow Launches High-Efficiency Micro Inverters for India’s Rooftop Solar Market

    August 19, 2025

    Reliance Infrastructure Secures LOA from NHPC for 390 MW Solar + BESS Project

    August 19, 2025

    HD Renewable Energy 50MW Storage Project in Hokkaido Completes Grid Connection

    August 19, 2025

    Subscribe for Updates

    Get the latest news about energy storage in your inbox.

      © 2025 Thebatterymagazine.
      • Home
      • About Us
      • Contact Us
      • Privacy Policy
      • Terms of Service

      Type above and press Enter to search. Press Esc to cancel.