Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » EDP Renewables North America Sign 20-Year PPA with California Water Service for Onsite Solar Project
Renewable energy

EDP Renewables North America Sign 20-Year PPA with California Water Service for Onsite Solar Project

PrakashBy PrakashJuly 24, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Cal Water and EDPR NA DG sign a 20-year agreement for an onsite solar project in Bakersfield to boost sustainability and cut energy costs.

EDPR NA Distributed Generation LLC (EDPR NA DG), the distributed generation business of EDP Renewables North America LLC (EDPR NA), and California Water Service (Cal Water) have signed a 20-year power purchase agreement (PPA) for a 1.75 MWac/2.35 MWdc onsite solar photovoltaic (PV) array at Cal Water’s Northeast Bakersfield Treatment Plant. The partnership is designed to reduce the utility’s long-term environmental footprint.

Cal Water and EDPR NA DG expect the system to generate approximately 3,800 megawatt-hours of renewable energy annually. The renewable energy generated by the solar array is anticipated to reduce grid energy costs by approximately $1.7 million over the term of the agreement, based on current electric rates for customers in the Bakersfield District, one of Cal Water’s largest service areas.

“At Cal Water, we are dedicated to being a responsible environmental steward, and partnering with EDPR NA DG will help us reduce traditional power costs, reach our science-aligned greenhouse gas emissions reduction targets, and increase sustainability,” said Marty Kropelnicki, Cal Water Chairman and CEO. “We look forward to bringing this new onsite solar array online, which is an important step for us to continue providing safe, reliable, and affordable water service to our customers for decades to come.”

“California is a national clean energy leader because of organizations like Cal Water, which prioritize supporting renewable energy investments,” said João Barreto, EDPR NA Distributed Generation CEO. “This partnership demonstrates the ever-increasing convergence of the water-energy nexus and the importance of investment in vital infrastructure throughout California.”

EDPR NA and EDPR NA DG have been actively engaged in California for more than two decades, developing utility-scale and distributed-scale solar projects to support the state’s growing energy demand. EDPR NA operates 1,138 MW of clean energy assets in California, powering the equivalent of 451,000 homes. EDPR NA DG’s portfolio in California spans more than 180 projects, including 75 MWac/81 MWdc in operation. In May 2024, EDPR NA announced the completion of the 200 MW Scarlet II Solar Energy Park in Fresno County, California. Scarlet II follows EDPR NA’s Scarlet I Solar Energy Park (Scarlet I), consisting of 200 MW of solar and 40 MW/160 MWh of battery energy storage system (BESS), which achieved commercial operation in 2024.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
lower energy costs solar project
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

Servotech Renewable Power Systems Appoints Shivinder Singh Buttar as VP and Head of HR

Servotech Renewable Power Systems Appoints Shivinder Singh Buttar as VP and Head of HR

Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

Comments are closed.

Renewable energy
Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

October 21, 2026
Servotech Renewable Power Systems Appoints Shivinder Singh Buttar as VP and Head of HR

Servotech Renewable Power Systems Appoints Shivinder Singh Buttar as VP and Head of HR

October 21, 2026
Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

October 21, 2026
NeoTerra Launches Solar-Powered Smart ACs With Up to 80% Energy Savings

NeoTerra Launches Solar-Powered Smart ACs With Up to 80% Energy Savings

October 21, 2026
Batteries
CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

October 21, 2026
Rondo Energy and Rio Tinto Begin Engineering for 360 MWh Heat Battery Project

Rondo Energy and Rio Tinto Begin Engineering for 360 MWh Heat Battery Project

October 21, 2026
Sahaj Solar Plans 1.8 GWh Battery Storage Manufacturing Facility in Gujarat

Sahaj Solar Plans 1.8 GWh Battery Storage Manufacturing Facility in Gujarat

October 21, 2026
Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

October 19, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.