Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » EESL Invites Bids for 120 kW Battery Energy Storage Project in Sikkim
Tenders

EESL Invites Bids for 120 kW Battery Energy Storage Project in Sikkim

PrakashBy PrakashDecember 11, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
EESL Invites Bids for 120 kW Battery Energy Storage Project in Sikkim

Energy Efficiency Services Limited (EESL), a joint venture of Public Sector Undertakings under the Ministry of Power, has released a tender for the development of a 120 kW / 6-hour Battery Energy Storage System (BESS) at New Melli, Sikkim. The project involves turnkey design, supply, testing, installation, and commissioning, fully funded through domestic resources.

Bids are invited via a single-stage, two-envelope system, with technical and financial proposals submitted separately. Only technically qualified bidders will have their financial proposals evaluated.

Tender Overview

  • Tender Title: Development of 120 kW / 6-hour BESS at New Melli, Sikkim
  • Total BESS Capacity: 120 kW with 6-hour storage
  • Technology: Lithium-Ion Battery Energy Storage System
  • Bidding Route: EPC, Single-Stage Two-Envelope System
  • Issuing Authority: Energy Efficiency Services Limited (EESL)

Project Location

  • Location: New Melli, Sikkim
  • Pre-Bid Meeting Venue: EESL Corporate Office, 1st to 4th Floor, IKON Tower, Film City, Sector 16A, Noida, Uttar Pradesh – 201301 (Online participation available)

Technical Specifications

  • System Architecture: Turnkey EPC delivery including design, engineering, supply, installation, testing, and commissioning

Key Components:

  • Battery Management System (BMS)
  • Energy Management System (EMS)
  • Power Conversion System (PCS)
  • Civil and electrical works
  • Auxiliary systems and fire safety

Performance Requirements:

  • 5-year warranty for battery components
  • 12-month (or 18-month from delivery) warranty for Balance of System (BoS) components
  • Completion within 3 months from Letter of Award (LOA)

Key Dates & Bid Conditions

  • Pre-Bid Meeting: 19 December 2025 at 11:00 AM IST
  • Bid Submission Deadline: 30 December 2025 at 11:00 AM IST (both online & hard copy)
  • Opening of Envelope-1 (Technical Bid): 30 December 2025 at 11:30 AM IST
  • Opening of Envelope-2 (Financial Bid): After technical evaluation
  • Tender Fee: ₹20,000 (non-refundable)
  • Bid Security / EMD: ₹500,000

Eligibility & Requirements

  • Open to domestic EPC contractors
  • Contractors must meet technical and financial qualification criteria
  • Turnkey delivery capability required, including installation, testing, commissioning, and warranty obligations

Project Significance

The New Melli BESS project strengthens India’s energy storage infrastructure in strategic regions like Sikkim, enhancing grid stability and reliability. It reflects EESL’s commitment to advanced energy storage solutions and sustainable energy development.

Capacity 120 kW / 6h
Location New Melli, Sikkim
Last Date 30/12/2025
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS BESS tender EESL Indian news
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Comments are closed.

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.