Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Epic Energy’s 100MW Mannum Battery Project hits a major milestone
Batteries

Epic Energy’s 100MW Mannum Battery Project hits a major milestone

PrakashBy PrakashJune 4, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp

Epic Energy’s Chief Executive Officer Clive D’Cruz welcomed the milestone and said the Mannum BESS will support the state’s ongoing energy security and energy transition. Located adjacent to Epic Energy’s two solar farms at its Mannum Energy Park, the BESS will be able to send 100 MW of power into the electricity grid for up to two hours—enough to power about 16,000 South Australian homes for a day.

“In May, the Mannum BESS achieved the necessary registration with the Australian Energy Market Operator (AEMO), which then signaled the project’s move into the commissioning phase.”

“Commissioning involves extensive testing, which is closely coordinated in conjunction with AEMO and ElectraNet. We expect this will take a number of months to complete before the BESS begins commercial operations later in the year.”

– Mr. D’Cruz.

The BESS will absorb surplus energy when demand is low and direct it into the grid to help support the consistent supply of renewable electricity to South Australian consumers and the national grid when demand peaks.

“We are excited to see this project moving towards operations and being a valuable part of the South Australian energy market and the Mannum community.”

– Mr. D’Cruz.

Epic Energy is proud to support the Mannum community, announcing in 2024 a significant funding contribution to the much-needed lighting upgrade at the Mannum Oval Complex and Showground.

Epic Energy is one of Australia’s leading energy infrastructure companies operating across the gas and electricity markets. Customers are at the center of everything it does, and as the world transitions to new forms of energy, it is broadening its range of solutions to embrace needs. The company has a growing portfolio of renewable infrastructure, which includes the Timboon West and Yawong Wind Farms, the Mannum Solar Farms, and the IKEA Adelaide Microgrid. It owns and operates more than 1,200km of gas transmission pipelines—South Australia’s Moomba to Adelaide Pipeline System (MAPS) and the South East Pipeline System (SEPS)—which transport gas to our customers in the residential, industrial, and power generation sectors in South Australia.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS renewable energy
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

Comments are closed.

Renewable energy
Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

October 21, 2026
Servotech Renewable Power Systems Appoints Shivinder Singh Buttar as VP and Head of HR

Servotech Renewable Power Systems Appoints Shivinder Singh Buttar as VP and Head of HR

October 21, 2026
Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

October 21, 2026
NeoTerra Launches Solar-Powered Smart ACs With Up to 80% Energy Savings

NeoTerra Launches Solar-Powered Smart ACs With Up to 80% Energy Savings

October 21, 2026
Batteries
CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

October 21, 2026
Rondo Energy and Rio Tinto Begin Engineering for 360 MWh Heat Battery Project

Rondo Energy and Rio Tinto Begin Engineering for 360 MWh Heat Battery Project

October 21, 2026
Sahaj Solar Plans 1.8 GWh Battery Storage Manufacturing Facility in Gujarat

Sahaj Solar Plans 1.8 GWh Battery Storage Manufacturing Facility in Gujarat

October 21, 2026
Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

October 19, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.