Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Fluence Energy to Deliver 300 MW BESS Project for AMPYR Australia
Batteries

Fluence Energy to Deliver 300 MW BESS Project for AMPYR Australia

PrakashBy PrakashJuly 8, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
Fluence Energy to deliver a 300 MW / 600 MWh battery storage system for AMPYR Australia’s first grid-scale BESS project in Wellington, NSW.

Fluence Energy, Inc., a global market leader delivering intelligent energy storage, services, and asset optimization software, today announced that the company has been selected by AMPYR Australia (AMPYR) for the 300 MW / 600 MWh Wellington Stage 1 Battery Energy Storage System (BESS) in Wellington, New South Wales, Australia. AMPYR has contracted Fluence for construction of this project and a 20-year service and maintenance contract. The project will also be powered by Fluence’s Mosaic bidding software and Nispera asset performance management software.

The Wellington Stage 1 BESS is AMPYR’s first grid-scale battery energy storage system to reach financial close in Australia. This project is scheduled to be energized in 2026, signaling a significant step towards bolstering Australia’s renewable energy capacity and grid stability.

Wellington Stage 1 will use Fluence’s Gridstack™ grid-scale energy storage product, underpinned by Fluence’s multi-generational technology platform. The system will be optimized by Mosaic, Fluence’s intelligent, AI-powered bidding software, designed to enhance the efficiency and profitability of BESS in the National Electricity Market (NEM), and Nispera, Fluence’s next-generation asset performance management software. Mosaic will be used to manage AMPYR’s virtual tolling contract, which will allow AMPYR to nominate when the battery should charge or discharge to maximize performance.

“We are thrilled to be partnering with AMPYR on the Wellington Stage 1 BESS project, marking another step forward in strengthening Australia’s transition to a more sustainable energy future. We believe the full suite of Fluence’s innovative storage products and operational services will allow AMPYR to extract the most value out of the Wellington BESS once operational. Fluence has a strong track record of delivering BESS projects in Australia, and our established team is dedicated to ensuring the Wellington BESS will create a more resilient grid for Australia.”

– Jan Teichmann, SVP & President, APAC.

“The Wellington Stage 1 grid-scale battery represents a significant contribution to growing Australia’s renewable energy capacity and strengthening its grid stability. Our partnership with Fluence will enable the delivery of competitively priced, reliable renewable energy to major Australian electricity users. This project is a crucial first step in our commitment to delivering 6,000 MWh of operational BESS by 2030, directly addressing the growing need for grid-scale batteries and accelerating Australia’s transition to a reliable, affordable, and renewable energy future.”

– AMPYR Australia CEO Alex Wonhas.

Fluence has a strong track record in Australia, with four battery energy storage systems currently in operation, another two entering operations in the next few months, and several BESS projects under construction.

Fluence Energy, Inc. is a global market leader delivering intelligent energy storage and optimization software for renewables and storage. The company’s solutions and operational services are helping to create a more resilient grid and unlock the full potential of renewable portfolios. With gigawatts of projects successfully contracted, deployed, and under management across nearly 50 markets, the company is transforming the way we power our world for a more sustainable future.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
AMPYR BESS Fluence Energy National Electricity Market renewable energy
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.