Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » GameChange Solar Secures First Tracker Project in New Zealand with Bright Fern Energy
Renewable energy

GameChange Solar Secures First Tracker Project in New Zealand with Bright Fern Energy

PrakashBy PrakashSeptember 2, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
GameChange Solar Secures First Tracker Project in New Zealand with Bright Fern Energy

GameChange Solar, a leading global supplier of solar tracker and fixed-tilt racking technology, announced that it has secured its first solar tracker project in New Zealand with Bright Fern Energy’s upcoming Dannevirke Solar Farm. The 23 MWp utility-scale project marks a key milestone in GameChange Solar’s footprint in Oceania, expanding its tracker presence into a new geography with locally adapted solutions. Bright Fern Energy is a cornerstone customer for GameChange Solar in the New Zealand market.

The project will feature GameChange Solar’s Genius Tracker™ 1P system with a four-string configuration and integrated SpeedClamp™ technology, designed to reduce module installation time and costs. This will be the first deployment of speed clamps in the region. The system is also equipped with HailStow™ functionality, which tilts modules to a safer angle during hail events, helping to mitigate potential damage and reduce insurance premiums. GameChange Solar’s early engineering involvement, particularly the detailed cut and fill assessment, was a key differentiator in optimizing site design and reducing overall project costs.

“GameChange Solar brought engineering insight, experience, and a clear understanding of project execution from an early stage in the process,” said Cassidy Prent, acting Chief Executive Officer, Bright Fern Energy. “They aligned with our technical priorities and were able to provide solutions tailored to our site conditions. We see them as a strong partner for this project.”

Located near the town of Dannevirke, the project is expected to be commissioned by March 2026. It represents the first of three fully consented projects that Bright Fern Energy will be taking through construction over the next 18 months.

“Our collaboration with Bright Fern Energy is an important step in strengthening our presence in New Zealand and across Oceania,” said Vaibhav Joshi, Managing Director – Oceania, GameChange Solar. “Our technology is designed to adapt to varied terrain and weather conditions, enabling more efficient builds and long-term reliability for utility-scale projects in this region. This project reflects our ability to align with developer objectives and deliver solutions that perform both in design and on the ground.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
GameChange Solar solar project
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.