Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » GameChange Solar Secures First Tracker Project in New Zealand with Bright Fern Energy
Renewable energy

GameChange Solar Secures First Tracker Project in New Zealand with Bright Fern Energy

PrakashBy PrakashSeptember 2, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
GameChange Solar Secures First Tracker Project in New Zealand with Bright Fern Energy

GameChange Solar, a leading global supplier of solar tracker and fixed-tilt racking technology, announced that it has secured its first solar tracker project in New Zealand with Bright Fern Energy’s upcoming Dannevirke Solar Farm. The 23 MWp utility-scale project marks a key milestone in GameChange Solar’s footprint in Oceania, expanding its tracker presence into a new geography with locally adapted solutions. Bright Fern Energy is a cornerstone customer for GameChange Solar in the New Zealand market.

The project will feature GameChange Solar’s Genius Tracker™ 1P system with a four-string configuration and integrated SpeedClamp™ technology, designed to reduce module installation time and costs. This will be the first deployment of speed clamps in the region. The system is also equipped with HailStow™ functionality, which tilts modules to a safer angle during hail events, helping to mitigate potential damage and reduce insurance premiums. GameChange Solar’s early engineering involvement, particularly the detailed cut and fill assessment, was a key differentiator in optimizing site design and reducing overall project costs.

“GameChange Solar brought engineering insight, experience, and a clear understanding of project execution from an early stage in the process,” said Cassidy Prent, acting Chief Executive Officer, Bright Fern Energy. “They aligned with our technical priorities and were able to provide solutions tailored to our site conditions. We see them as a strong partner for this project.”

Located near the town of Dannevirke, the project is expected to be commissioned by March 2026. It represents the first of three fully consented projects that Bright Fern Energy will be taking through construction over the next 18 months.

“Our collaboration with Bright Fern Energy is an important step in strengthening our presence in New Zealand and across Oceania,” said Vaibhav Joshi, Managing Director – Oceania, GameChange Solar. “Our technology is designed to adapt to varied terrain and weather conditions, enabling more efficient builds and long-term reliability for utility-scale projects in this region. This project reflects our ability to align with developer objectives and deliver solutions that perform both in design and on the ground.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
GameChange Solar solar project
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

Comments are closed.

Renewable energy
Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

July 21, 2026
GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

July 21, 2026
India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

July 21, 2026
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Batteries
Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.