Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Hindustan Power Wins SECI Bid for 150 MW Solar and 300 MWh Battery Storage Project
Batteries

Hindustan Power Wins SECI Bid for 150 MW Solar and 300 MWh Battery Storage Project

PrakashBy PrakashNovember 26, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Hindustan Power Wins SECI Bid for 150 MW Solar and 300 MWh Battery Storage Project

Hindustan Power, one of India’s leading integrated energy companies, has won a bid from the Solar Energy Corporation of India (SECI) to develop a solar and battery energy storage project with a contracting capacity of 150 MW solar, requiring installation of about 300 MWp of solar and 300 MWh of Battery Energy Storage Systems (BESS). The project will be developed under the SECI–ISTS–XX tender. The project is designed for flexible deployment and can be set up at suitable locations across India.

The project was secured through a tariff-based competitive bidding process, followed by a successful e-Reverse Auction (e-RA) conducted on the ETS portal. It was awarded under SECI’s tender for ISTS-connected Solar PV projects with integrated Battery Energy Storage Systems (BESS).

This development marks another step forward in Hindustan Power’s efforts to strengthen its renewable energy portfolio and contribute to India’s clean energy goals. The integration of solar generation with battery storage will enable enhanced grid reliability, improved power management during peak hours, and a more stable supply of clean energy.

Commenting on the development, Mr. Ratul Puri, Chairman, Hindustan Power, said, “This project reflects our continuous commitment to advancing India’s transition toward a modern, flexible, and future-ready energy ecosystem. Our focus remains on building assets that deliver stability and efficiency, as we continue to build future-ready energy infrastructure that supports India’s clean-energy ambitions.”

By combining solar power with advanced storage, Hindustan Power continues to support national goals for sustainability, energy security, and the delivery of clean power. The company is currently developing clean-energy projects across various parts of India. It is commissioning a 435 MW solar project in Uttar Pradesh, a 100 MW solar power plant along with a state-of-the-art 100 MW battery-energy storage system in Assam, and a 120 MWh battery-storage project in Bihar. The company has also secured a new contract from SJVN Limited to build a 100 MW solar project paired with a 200 MWh battery-storage system. Together, these projects reflect Hindustan Power’s commitment to expanding India’s clean-energy footprint.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS clean-energy momentum Hindustan Power India renewable energy SECI solar plus battery
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Comments are closed.

Renewable energy
Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

July 20, 2026
Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

July 20, 2026
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
Batteries
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.