Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » India Achieves Historic Milestone of 100 GW Solar PV Module Manufacturing Capacity under ALMM
Renewable energy

India Achieves Historic Milestone of 100 GW Solar PV Module Manufacturing Capacity under ALMM

PrakashBy PrakashAugust 14, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
MNRE Urges CERC to Delay Stricter Regulations on Green Power

India has achieved a landmark milestone of 100 GW of solar PV module manufacturing capacity enlisted under the Approved List of Models and Manufacturers (ALMM) for Solar PV Modules. This achievement reflects the country’s rapid progress in building a robust and self-reliant solar manufacturing ecosystem, aligned with the national vision of Atmanirbhar Bharat and the global imperative for clean energy transition.

Highlighting this achievement, Union Minister of New and Renewable Energy Shri Pralhad Joshi said “ India has achieved a historic milestone -100 GW Solar PV Module Manufacturing Capacity under the Approved List of Models and Manufacturers (ALMM), a remarkable rise from just 2.3 GW in 2014! Driven by the visionary leadership of Prime Minister Shri Narendra Modi and transformative initiatives like the Production Linked Incentive (PLI) Scheme for High-Efficiency Solar Modules, we are building a robust, self-reliant solar manufacturing ecosystem. This achievement strengthens our path towards Atmanirbhar Bharat and the target of 500 GW non-fossil capacity by 2030.”

The Government of India’s commitment is to make India self-reliant in solar PV manufacturing and establish the country as a major player in the global value chain. This commitment is supported through a comprehensive set of initiatives, including the PLI Scheme for High Efficiency Solar PV Modules and measures to provide a level playing field for the Indian manufacturers. The catalytic effect of these interventions has resulted in an expansion in solar module manufacturing capacity, from just 2.3 GW in 2014 to over 100 GW today. This reinforces India’s commitment to achieving 500 GW of non-fossil fuel capacity by 2030 and will contribute meaningfully to global decarbonization efforts.

The ALMM Order was issued by the Ministry of New and Renewable Energy (MNRE) on 02 January 2019. The first ALMM list for solar PV modules was published on 10 March 2021 with an initial enlisted capacity of around 8.2 GW. In just over four years, this capacity has grown more than twelvefold, crossing the 100 GW mark. This remarkable expansion is not just limited to the depth of capacity achieved, but by the breadth of the number of manufacturers who have also significantly increased from 21 in 2021 to 100 manufacturers, who are operating 123 manufacturing units currently.

This growth includes contributions from both established companies and new entrants, many of whom have adopted high-efficiency technologies and vertically integrated operations. The result is a diverse and competitive manufacturing landscape capable of meeting domestic needs and serving global markets. The crossing of the 100 GW solar module manufacturing capacity underscores the success of the Indian solar PV manufacturing story, and the collective efforts of industry, various State governments, and the Government of India.

MNRE remains committed to further strengthening the solar manufacturing ecosystem through continued policy support, infrastructure development, and innovation. The Ministry will continue engaging with stakeholders to ensure India’s solar journey remains inclusive, competitive, and future-ready.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
ALMM Atmanirbhar Bharat MNRE India solar PV modules
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Comments are closed.

Renewable energy

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

October 16, 2026
NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

October 16, 2026
Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

October 16, 2026
Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

October 16, 2026
Batteries
Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

October 16, 2026

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

October 16, 2026
Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

October 16, 2026
NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

October 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.