Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » IREDA signs Performance MoU with MNRE, Rs. 8,200 Crore Revenue Target for FY 2025-26
Renewable energy

IREDA signs Performance MoU with MNRE, Rs. 8,200 Crore Revenue Target for FY 2025-26

PrakashBy PrakashAugust 26, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
IREDA signs Performance MoU with MNRE, ₹8,200 Crore Revenue Target for FY 2025-26

Indian Renewable Energy Development Agency Limited (IREDA) has signed a performance-based Memorandum of Understanding (MoU) with the Ministry of New and Renewable Energy (MNRE), Government of India, outlining strategic targets for the fiscal year 2025-26.

The MoU was signed by Shri Santosh Kumar Sarangi, Secretary, MNRE and Shri Pradip Kumar Das, Chairman & Managing Director, IREDA at Atal Akshay Urja Bhawan, New Delhi, in the presence of senior officials from MNRE and IREDA.

Under the MoU, the Government of India has set a Revenue from Operations target of ₹8,200 crores for FY 2025-26. IREDA had exceeded its Revenue from Operations target in FY 2024-25, achieving ₹6,743.32 crores against the target of ₹5,957 crores. The MoU also includes key performance parameters such as Return on Net Worth, Return on Capital Employed, NPA to Total Loans, Asset Turnover Ratio, and EBTDA, among other targets.

Expressing confidence in the company’s growth trajectory, Shri Pradip Kumar Das, CMD, IREDA, said, “With the hope for continuing excellent performance for this year also, we are committed to sustaining our track record of excellence. IREDA has earned an ‘Excellent’ rating in MoU performance for four consecutive years since FY 2020-21. For the FY 2023-24 MoU rating, IREDA emerged as the top performer in the NBFC and Power sector and among the top four CPSEs across sectors, as per a list of 84 CPSEs issued by the Department of Public Enterprises.”

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
agreement IREDA memorandum of understanding MNRE India
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

Comments are closed.

Renewable energy

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

October 16, 2026
NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

October 16, 2026
Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

October 16, 2026
Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

October 16, 2026
Batteries
Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

October 16, 2026

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

October 16, 2026
Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

October 16, 2026
NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

October 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.