Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Limes Renewable Secures RCA for Major Solar-Plus-BESS Project in Chile
Batteries

Limes Renewable Secures RCA for Major Solar-Plus-BESS Project in Chile

PrakashBy PrakashDecember 1, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
Limes Renewable Secures RCA for Major Solar-Plus-BESS Project in Chile

Limes Renewable Energy (Limes), a global developer specializing in solar, wind, and battery energy storage system (BESS) projects, has successfully secured the Environmental Qualification Resolution (RCA) for its Pradera Larga project in Chile’s Valparaíso Region. Building on an approach consolidated over many years in Italy, this milestone marks a key step in Limes’ international expansion and its contribution to Chile’s long-term energy transition.

Pradera Larga is Limes’ most ambitious project outside of Europe to achieve this milestone to date. The hybrid project will combine 84 MWp of solar PV with a 90 MW BESS, representing an estimated total investment of around US$150 million.

Located in the Casablanca area of Central Chile, Pradera Larga reflects Limes’ strategy of developing renewable assets closer to high electricity demand centers. While large-scale solar PV in Central Chile involves more complex permitting than in the northern desert regions, Limes is focused on the long-term advantages of these locations, including strong and growing demand and limited local generation. By reducing dependence on long-distance transmission, this approach also helps lower Power Purchase Agreement (PPA) contract risk, a well-known bottleneck for PV projects in Northern Chile.

Martin Libra, Limes Head of LATAM, said, “Pradera Larga is a flagship project for Limes in Chile. Reaching this milestone in such a complex area demonstrates our expertise in developing challenging projects and confirms that we are focused on the right locations. With Pradera Larga and the rest of our Chilean pipeline moving toward maturity, Limes is strongly positioned in the region and actively assessing new opportunities across Latin America.”

Cristiano Spillati, Limes Managing Director, commented, “Securing the RCA for Pradera Larga reaffirms our long-term commitment to Chile and reflects the sustained efforts of our local team. Building on the track record we have established over many years in Italy, we are now applying the same strategy in Chile, fully aligned with our vision to become an independent power producer (IPP).”

Over the next year, Limes will advance the project toward Ready-to-Build (RTB), progressing construction financing, PPA negotiations, and procurement activities. Limes also expects to secure the environmental approval (RCA) for BESS Huañil (200 MW) and to advance the rest of its utility-scale development pipeline. The company’s Chilean pipeline continues to expand and now includes approximately 180 MWp of solar PV and 620 MW of BESS, including Pradera Larga, BESS Huañil, and early-stage developments such as BESS Pimiento (100 MW) and BESS El Ganso (150 MW), to further strengthen the country’s storage backbone. Earlier in 2025, Limes also completed its first project sale outside its domestic market in Italy, divesting an early-stage Chilean standalone BESS asset to a multinational IPP.

Building on its strong track record in Italy, Limes is positioning Chile as a key market for its long-term growth strategy and wider expansion across Latin America, while closely evaluating new opportunities throughout the region.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS projects Solar plus BESS
Prakash
  • Website
  • LinkedIn

I am a Junior Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

Comments are closed.

Renewable energy
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Kyro Capital

Kyro Capital Launches ₹100 Crore Pre-IPO Fund Targeting Renewable Energy and Growth Sectors

June 3, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.