Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » LRE Launches 126 MW Antelope Valley Battery Storage Facility, Marking First Stand-Alone Grid-Connected Project in California
Batteries

LRE Launches 126 MW Antelope Valley Battery Storage Facility, Marking First Stand-Alone Grid-Connected Project in California

PrakashBy PrakashMay 29, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
LRE Launches 126 MW Antelope Valley Battery Storage Facility, Marking First Stand-Alone Grid-Connected Project in California.

LRE (Leeward Renewable Energy) has announced that its Antelope Valley Battery Energy Storage System (BESS)—a 126-megawatt (MW) / 504 megawatt-hour (MWh) stand-alone battery facility—is now fully operational in Kern County, California. Antelope Valley BESS represents a key milestone in LRE’s energy storage strategy as its first grid-connected, stand-alone battery project and the company’s seventh clean energy project online in the state.

Antelope Valley BESS is powered by four-hour Lithium Iron Phosphate (LFP) batteries provided by Powin and is designed to support California’s electric grid by storing energy when demand is low and discharging it during peak periods. This capability improves grid reliability, offsets carbon-intensive generation, and enhances overall energy flexibility.

“Bringing the Antelope Valley BESS facility online is a major milestone for LRE and reflects our commitment to accelerating energy innovation in California. As our first stand-alone battery project, it expands our capabilities to deliver dispatchable power when and where it is needed most. We are proud to support the broader energy market as California transitions to a cleaner, more resilient grid that can meet growing demand.”

– Sam Mangrum, EVP Project Execution at LRE.

The project created approximately 90 jobs during construction and is expected to deliver long-term economic benefits to Kern County through local tax revenues—including an estimated $30 million in property taxes over the life of the project—and community investments.

As LRE’s seventh operating project in California, it adds to a growing portfolio that now generates enough clean electricity to power more than 28,000 homes annually while offsetting nearly 30,228 metric tons of carbon dioxide equivalent emissions each year.

In line with its ongoing commitment to community partnership, LRE has supported local initiatives with donations to Rosamond Hills Senior Apartments, which provides housing for low-income seniors, and the Kern County Sheriff’s Mounted Posse, a charitable organization dedicated to community service.

“Our mission goes beyond clean energy—we strive to leave a lasting, positive impact in the communities where we operate. Antelope Valley BESS not only strengthens California’s grid but also supports economic growth and resilience in Kern County.”

– Sam Mangrum, EVP Project Execution at LRE.

LRE continues to expand its national portfolio of utility-scale wind, solar, and battery storage projects, with more than 4 GW currently operating.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.

battery storage projects BESS Leeward Renewable Energy Product Launch
Prakash
  • Website
  • LinkedIn

I am a Junior Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

Comments are closed.

Renewable energy
PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

June 4, 2026
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.