Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » MNRE Issues Operational Guidelines for Central Financial Assistance under PM Surya Ghar ULA Model
Renewable energy

MNRE Issues Operational Guidelines for Central Financial Assistance under PM Surya Ghar ULA Model

PrakashBy PrakashOctober 8, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
India Achieves 50% Non-Fossil Power Capacity and Clarifies No Halt in Renewable Project Financing

The Ministry of New and Renewable Energy (MNRE) has issued detailed operational guidelines for the release of Central Financial Assistance (CFA) under the Utility Led Aggregation (ULA) model of the PM Surya Ghar: Muft Bijli Yojana. This directive follows the Ministry’s earlier Office Memorandum dated 28.12.2024, aimed at streamlining the implementation of rooftop solar (RTS) projects under the scheme.

Key highlights of the fund release mechanism are as follows:

  • Release of CFA Post Commissioning: The CFA will be disbursed in a single tranche, strictly contingent upon the successful physical installation, inspection, and commissioning of the RTS systems. No advance payments will be allowed.
  • Process on the National Portal: State, Utility, or Implementing Agencies are required to issue work orders or execution agreements to selected vendors and upload verified consumer installation data and vendor bank details on the National Portal. Following physical verification and commissioning, the “ULA Redeem” option will be used to initiate CFA disbursement with detailed consumer- and vendor-wise records.
  • Verification and Payment by NPIA: The National Power Implementation Agency (NPIA) will verify installation reports and vendor bank details before directly releasing CFA payments to vendors. Notifications will be sent to concerned State/Utility/Implementing Agencies, ensuring transparency in fund disbursement.
  • Changes in Vendor Details: Any updates or modifications in vendor bank details must be routed through NPIA for verification to maintain accuracy and transparency.
  • Uniform Applicability: This payment mechanism applies uniformly across all ULA model proposals, including Utility Owned (EPC and sub-RESCO) and Consumer Owned models.

All ULA Implementing Agencies and State/UT entities are directed to strictly adhere to these procedures without deviation to ensure transparent and timely utilization of CFA funds.

The guidelines have been issued with the approval of the Hon’ble Minister of New and Renewable Energy.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Central Financial Assistance MNRE PM Surya Ghar Muft Bijli Yojana
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.