Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Green Hydrogen » Nel Hydrogen Receives Order for 2.5 MW Electrolyser to Power Swiss Green Hydrogen Project
Green Hydrogen

Nel Hydrogen Receives Order for 2.5 MW Electrolyser to Power Swiss Green Hydrogen Project

PrakashBy PrakashOctober 7, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Nel Hydrogen Receives Order for 2.5 MW Electrolyser to Power Swiss Green Hydrogen Project

Nel Hydrogen US, a subsidiary of Nel ASA (Nel), has received a firm purchase order from H2 Energy for one MC500, a containerized 2.5 MW PEM electrolyser. The system will be delivered to the Association for Waste Disposal (Verein für Abfallentsorgung, VfA) in Buchs, Switzerland. VfA Buchs has selected H2 Energy to deliver a turn-key hydrogen production and refueling facility. The hydrogen produced will be integrated into the Swiss green hydrogen ecosystem and contribute to further decarbonize regional energy supply and mobility solutions.

The new plant will utilize locally generated electricity to produce hydrogen for VfA’s own fleet of waste collection trucks, for industrial use and for distribution within the broader Swiss hydrogen ecosystem.

This purchase order marks the second MC500 system H2 Energy has ordered from Nel, alongside a containerized MC400 and a smaller C30 PEM unit, a testament to the quality and reliability of Nel’s PEM technology, as well as the company’s long-standing experience in electrolyser manufacturing.

“H2 Energy has a long history of trusted cooperation with Nel dating back to 2016 where a C30 PEM electrolyser was used to fuel a first ecosystem based on heavy duty mobility. Since then, we have installed and operated an MC400 PEM electrolyser for over 30,000 hours for our joint venture Hydrospider and have racked up over 12,000 hours on an MC500 with our customer WPO. These two H2 plants form the backbone of the Swiss Green Hydrogen Ecosystem, fueling a network of 18 refuelling stations and propelling a fleet of heavy-duty fuel cell trucks over 14,000,000 kilometers,” says Rolf Huber, founder and Chairman, H2 Energy.

“This next project for VfA marks another major milestone for the Swiss Green Hydrogen Ecosystem and we are looking forwards to continuing to work closely with Nel to decarbonize the mobility and other industry sectors in Switzerland and beyond,” Huber says.

“We are very pleased to support H2 Energy and VfA Buchs in this project. H2 Energy has been an early mover in building out a commercial green hydrogen value chain. This installation highlights the close relationship we have with the client and demonstrates their ability to consistently deliver high-quality projects into the field,” says Todd Cartwright, Chief Commercial Officer at Nel.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
green hydrogen
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

PM Modi flags off first hydrogen-powered train on Jind-Sonipat route

PM Modi flags off first hydrogen-powered train on Jind-Sonipat route

Avaada Electro Commissions First 3 GW TOPCon Solar Cell Line in Nagpur

Avaada Electro Commissions First 3 GW TOPCon Solar Cell Line in Nagpur

Wärtsilä's Hydrogen Engine Milestone Supports India's Clean Energy Goals

Wärtsilä’s Hydrogen Engine Milestone Supports India’s Clean Energy Goals

Comments are closed.

Renewable energy
Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

July 20, 2026
Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

July 20, 2026
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
Batteries
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.