Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » OREDA Invites Bids for Rooftop Solar Projects in Government Universities
Tenders

OREDA Invites Bids for Rooftop Solar Projects in Government Universities

ManshiBy ManshiFebruary 20, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
OREDA Invites Bids for Rooftop Solar Projects in Government Universities

The Odisha Renewable Energy Development Agency (OREDA) has put out the Odisha rooftop solar tender, which invites qualified bidders to build on-grid rooftop solar projects at government universities in the state. The goal of the program is to get more higher education institutions in Odisha to use renewable energy and less on traditional grid electricity.

Comprehensive Scope of Work

According to the tender notice, the Odisha rooftop solar tender covers the complete project lifecycle. The selected bidder will handle design and engineering, supply and installation, testing, and commissioning of rooftop solar photovoltaic (PV) systems.

In addition, the contractor will be responsible for comprehensive operation and maintenance (O&M) of the systems for a period of ten years. This long-term O&M requirement under the Odisha rooftop solar tender is intended to ensure consistent performance, reliability, and durability of the installed assets.

Capacity Based on Institutional Needs

The rooftop solar PV systems that will be installed under the Odisha rooftop solar tender will be sized differently for each university based on how much electricity they use and how easy it is to install on their roofs. Among the institutions mentioned in related communications is Biju Patnaik University of Technology in Rourkela, along with other organizations located in Berhampur.

Capacity allocation will be based on how much each institution uses and the rooftop infrastructure that is available. The technical bid documents on OREDA’s e-procurement portal include all the information you need about the Odisha rooftop solar tender, including the technical specifications, eligibility requirements, and system parameters. Bidders must follow the rules and standards set out in the tender documents exactly.

Timelines and Submission Details

As per the schedule, a virtual pre-bid meeting for the Odisha rooftop solar tender will take place on February 21, 2026. The last date for online bid submission is February 27, 2026, by 5:00 PM. By March 5, 2026, at 5:00 PM, you must send in hard copies of the required documents, such as the cost of the bid, bid security, and power of attorney.

The notice also mentions a tentative technical bid opening date of February 06, 2026, at 3:00 PM, which appears inconsistent with the submission timeline and may indicate a typographical error.

The Odisha rooftop solar tender forms part of the state’s broader strategy to expand distributed solar generation across public institutions and strengthen Odisha’s renewable energy footprint while promoting sustainable practices in the academic sector.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
India News renewable energy rooftop solar solar photovoltaic
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Comments are closed.

Renewable energy
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Kyro Capital

Kyro Capital Launches ₹100 Crore Pre-IPO Fund Targeting Renewable Energy and Growth Sectors

June 3, 2026
Batteries
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026
Hoymiles Launches AI-Powered HiBattery 4020 Home Energy Storage Series

Hoymiles Launches AI-Powered HiBattery 4020 Home Energy Storage Series

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.