Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » PM Modi Inaugurates Avaada’s 280 MW Solar Project in Gujarat
Renewable energy

PM Modi Inaugurates Avaada’s 280 MW Solar Project in Gujarat

PrakashBy PrakashSeptember 22, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
PM Modi Inaugurates Avaada’s 280 MW Solar Project in Gujarat

Avaada Group, a leading diversified energy conglomerate, marked a significant milestone in its journey towards sustainable energy transformation with the inauguration of its 280 MW solar power project at Surendranagar, Gujarat. The project was formally inaugurated by the Hon’ble Prime Minister Shri Narendra Modi Ji, underscoring the government’s commitment to accelerating India’s clean energy transition and strengthening the vision of an Aatmanirbhar Bharat.

Developed under the Gujarat State Solar Policy, the project spans over 1,170 acres in the villages of Tavi and Varsani in the Surendranagar district and entails a total investment of ₹1,500 crore. It is equipped with Avaada Electro’s ALMM-certified, made-in-India TOPCon N-Type bifacial solar PV modules, reflecting a strong emphasis on domestic manufacturing and technological innovation. The electricity generated will be supplied to GUVNL (Gujarat Urja Vikas Nigam Limited), contributing significantly to the state’s renewable energy mix and ensuring cleaner and more affordable power for the region’s citizens, particularly farmers.

On the same occasion, the Hon’ble Prime Minister laid the foundation stone for Avaada’s 100 MW solar power project in Vadodara district. Spread across 350 acres and with a planned investment of ₹400 crore, the project is being implemented by Avaada GJ Solar and is expected to be commissioned by April 2026.

The Vadodara project is designed to reduce approximately 212,806 tons of CO₂ emissions annually and will conserve nearly 40 lakh liters of water every year through the deployment of advanced robotic module cleaning technology—a step forward in integrating sustainability at all levels of project execution.

Speaking on the occasion, Mr. Vineet Mittal, Chairman of Avaada Group, said, “At Avaada, our mission goes beyond generating energy—it is about contributing to India’s growth story and empowering communities. The inauguration of this project by the Hon’ble Prime Minister is a proud moment for us and reinforces our commitment to delivering clean, affordable, and sustainable energy solutions to every Indian.”

The Surendranagar project is expected to significantly enhance energy access and agricultural productivity in the region by providing reliable, daytime power for irrigation. This will reduce farmers’ dependence on nighttime power supply, which is often affected by load shedding, and will improve operational efficiency. The project also plays a crucial role in grid stabilization, reducing the subsidy burden on the state and cutting reliance on costlier conventional power sources during peak demand hours.

From an environmental perspective, the Surendranagar project is expected to offset around 595,857 tons of CO₂ emissions annually and conserve approximately 112 lakh liters of water per year using robotic module cleaning systems, thereby minimizing the project’s ecological footprint.

In line with its commitment to community development, Avaada has initiated several CSR programs as part of the project, including free tuition classes for local students, establishment of computer labs, cybersecurity awareness workshops, healthcare camps, and skill development initiatives aimed at empowering women in the region.

Avaada Group continues to lead India’s clean energy transition through its integrated approach across the energy value chain. With a robust portfolio covering renewable power generation, solar PV manufacturing, green hydrogen and derivatives, green data centers, battery storage, and pumped hydro projects, Avaada remains committed to creating a sustainable and self-reliant energy ecosystem for India.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Avaada Electro Avaada Group clean energy Gujarat Solar Projects renewable energy
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

Comments are closed.

Renewable energy
Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

July 21, 2026
GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

July 21, 2026
India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

July 21, 2026
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Batteries
Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.