Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Prostarm to Build 1.2 GWh BESS Manufacturing Plant in Haryana’s MET City
Batteries

Prostarm to Build 1.2 GWh BESS Manufacturing Plant in Haryana’s MET City

PrakashBy PrakashJuly 9, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Prostarm Info Systems is setting up a 25 crore rupee BESS plant in Haryana's MET City with 1.2 GWh annual capacity.

Prostarm Info Systems is also intending to build its initial Battery Energy Storage System (BESS) fabrication plant within the Reliance MET City, in Jhajjar, Haryana. It is one of the major milestones in terms of the initiative of the company to strengthen its manufacturing capacity in the battery energy storage solution segment.

In terms of the planned expansion, the Company has already leased a 9-year term, rent until April 2034 (with the start of the term in May 2025), a parcel of land where, in addition to the open space, there is a covered-shed area of 34,000 sq. ft. Its planned total capex allocation on the project is Rs 25 crore to include installation of advanced plant and machinery, office structure, HVAC systems, additional power capacity, anti-static flooring, and warehousing, among other facilities to accommodate high-end assembly and integration. The plant will include an annual manufacturing capacity of 1.2 GWh, which will allow Prostarm to receive large-scale demand to cover various industries.

“This strategic expansion marks our entry into the fast-growing BESS segment, which is a natural extension of our core expertise in power electronics. With this facility, the company aims to become one of India’s few OEMs manufacturing BESS solutions, allowing us to directly supply to EPC contractors and developers, thereby opening up significant new revenue opportunities.”

“We believe this strategic expansion positions Prostarm at the forefront of India’s energy transformation. In BESS, the company already secured a 22 MWh order from Adani Electricity Mumbai Ltd. for design, supply, installation, commissioning and testing, having a contract value of approximately INR 52 crore, and another LOI from Bihar State Power Generation Company Ltd. for 120 MWh on a BOOT model with a monthly rental of INR 4.44 lakh/MW for a period of 12 years.”

– Ram Agarwal, Whole Time Director and CEO of Prostarm Info Systems.

The BESS unit will serve commercial & industrial (C&I) as well as utility-scale. The plant is projected to go online at the end of financial year 2026, and together with the apparently challenging goals the country of India has set in terms of renewable energy production and distribution, the plant will serve the increasing needs of energy storage solutions through financing the demand.

Propstarm Info Systems is involved in making design, manufacturing, assembly, sale, service as well as supplying energy storage equipment and power conditioning equipment (power solution products) in India.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS Energy Storage Solutions renewable energy
Prakash
  • Website
  • LinkedIn

I am a Junior Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

NGEL Floats Tender for 3,200 MWh Battery Storage Project in Rajasthan

NGEL Floats Tender for 3,200 MWh Battery Storage Project in Rajasthan

NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

Comments are closed.

Renewable energy
PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

June 4, 2026
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.