Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Prostarm Wins Major 150 MW/300 MWh BESS Project from KPTCL
Batteries

Prostarm Wins Major 150 MW/300 MWh BESS Project from KPTCL

PrakashBy PrakashAugust 21, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Prostarm Wins Major 150 MW/300 MWh BESS Project from KPTCL

Prostarm Info Systems Limited announces a major milestone in its growth journey, having been awarded the L-1 (lowest) bid by Karnataka Power Transmission Corporation Limited (KPTCL) for a high-value energy project.

This significant achievement marks a powerful step forward in Prostarm’s strategic expansion into the renewable energy sector and reinforces its position as a competitive force in the industry. The project win not only reflects the company’s growing capabilities but also promises to enhance its presence in the green energy landscape.

But what is the hype?

Prostarm will now build a 150 MW/300 MWh Battery Energy Storage System (BESS) Standalone, which will be established in the 400 kV Doni Substation in the Gadag District in Karnataka, owned by KPTCL. This is basically like a huge battery that can smooth out the power grid (which is particularly important in the incorporation of intermittent sources of renewable power such as solar and wind).

This is not a dead end. This is a long-term relationship. It is on a 12 year long-term basis, with the project being conducted on a Build Own Operate (BOO) basis. This implies that Prostarm will be the builder of the system, the owner and subsequently the operator of the system over a period of more than 10 years, providing a consistent revenue flow.

Fund-wise the deal will be strong. The project is attached to an annual leasing of Rs. 45.72 Crores (this is based on Rs. 2.54 lacs per MW per month of the 150 MW/300 MWh capacity). It is also included in a Tariff Based Competitive Bidding (TBCB) mode that in many situations guarantees fair and competitive pricing. It also has extra VGF (Viability Gap Funding) of Rs. 27 Lacs / MWh, or 30 % of the capital cost of BESS whichever is lesser, to supplement the financing further.

This award demonstrates the expanding capabilities of Prostarm in an energy-starved market that is critical to the energy storage segment, which plays a significant role in India shifting its power grid to greener and stable power. It is a tactical step that puts this company in the energy infrastructure future. Watch out for how this project will develop!

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS Build Own Operate energy storage green energy
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Comments are closed.

Renewable energy

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

October 16, 2026
NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

October 16, 2026
Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

October 16, 2026
Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

October 16, 2026
Batteries
Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

October 16, 2026

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

October 16, 2026
Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

October 16, 2026
NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

October 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.