Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Scatec Secures $479M Financing for Egypt’s 1.1GW solar + 100MW/200MWh BESS Project
Batteries

Scatec Secures $479M Financing for Egypt’s 1.1GW solar + 100MW/200MWh BESS Project

PrakashBy PrakashJune 16, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Scatec has reached financial close on its $590 million “Obelisk” hybrid solar and battery project in Egypt.

Scatec ASA has reached financial close for the “Obelisk” hybrid solar and battery storage project in Egypt. The non-recourse project financing comprises USD 479.1 million provided by the European Bank for Reconstruction and Development (EBRD), African Development Bank (AfDB), and British International Investment (BII). The financing amount corresponds to approximately 80% of the total estimated capex of USD 590 million.

“Reaching financial close for this project marks a major milestone for Scatec. It proves our ability to deliver large-scale hybrid projects. We are proud to partner with leading development finance institutions to support Egypt’s clean energy ambitions, and we look forward to delivering this important project together with our partners.”

– Terje Pilskog, Scatec CEO.

The project will be constructed in two phases. The first phase of 561 MW solar + 100 MW/200 MWh battery storage is targeted to reach commercial operational date (COD) in the first half of 2026. The second phase of 564 MW solar in the second half of 2026. The energy will be sold under a USD-denominated 25-year Power Purchase Agreement (PPA) with the Egyptian Electricity Transmission Company (EETC), backed by a sovereign guarantee.

Scatec has previously signed equity bridge loans (EBL) of USD 120 million for the project, postponing the project equity injections to the end of the construction period. The company is also in advanced discussions with potential equity partners, expected to conclude in the next few months.

Scatec will deliver Engineering, Procurement and Construction (EPC), Asset Management (AM), and Operations & Maintenance (O&M) services for the project. Scatec’s EPC scope is approximately 70% of total capex.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS Scatec ASA solar plus battery
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

Comments are closed.

Renewable energy
Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

July 20, 2026
Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

July 20, 2026
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
Batteries
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.