Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Scatec Wins Battery Storage Project in South Africa
Batteries

Scatec Wins Battery Storage Project in South Africa

PrakashBy PrakashJune 3, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Scatec wins preferred bidder status for the 123 MW/492 MWh Haru BESS project in South Africa.

Scatec ASA has been awarded preferred bidder status for the Haru BESS Battery Energy Storage Project, totaling 123 MW/492 MWh, in the third bid window of the Battery Energy Storage Independent Power Producer Procurement Programme (BESIPPPP) in South Africa by the Department of Mineral Resources and Energy.

Scatec will receive payments under a 15-year agreement for making the storage capacity available for the National Transmission Company of South Africa (NTCSA), which will utilize the capacity to balance the grid.

The estimated total capex for the battery energy storage project is ZAR 2.2 billion (USD 120 million), of which Scatec’s EPC contracts account for approximately 80%. The project will be financed by 90% non-recourse project debt and the remaining by equity from the owners.

“Today’s award reaffirms our standing as a leading renewable energy player in South Africa. We applaud the South African government’s commitment and dedication to the renewable energy procurement programs. Battery energy storage will continue to play an important role in the energy transition, and we will continue to be at the forefront across our core markets.”

– Terje Pilskog Scatec CEO.

Building on the experience garnered from the hybrid solar and battery storage projects at Kenhardt and the ongoing construction of Mogobe BESS, Scatec continues to actively support battery integration to stabilize the national grid.

“Dispatchable energy and grid infrastructure are now more important than ever in the pathway to unlock the sustainability of South Africa’s current and future energy system.”

– Alberto Gambacorta, GM and EVP Sub-Saharan Africa, Scatec.

Scatec will own 50.01% of the equity in the project, with Stanlib’s Greenstreet and Redstreet Funds owning 44.99% and a Community Trust holding 5%. Scatec will provide engineering, procurement, and construction (EPC), operations & maintenance (O&M), and asset management (AM) services to the project.

According to the Department of Mineral Resources and Energy, commercial close is expected to be concluded by the end of Q1 2026. The project will be located in the Free State Province.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery projects CleanEnergy EnergyStorage Scatec ASA
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Waaree Renewable Wins EPC Order for 291 MWp Solar

Waaree Renewable Wins EPC Order for 291 MWp Solar and 280 MWh BESS Project

Livguard Strengthens Kashmir Presence

Livguard Strengthens Kashmir Presence with First Exclusive Brand Outlet in Anantnag

Copenhagen Infrastructure Partners Expands Australian Portfolio

Copenhagen Infrastructure Partners Expands Australian Portfolio with Wind and Battery Project Acquisition

Comments are closed.

Renewable energy
Waaree Renewable Wins EPC Order for 291 MWp Solar

Waaree Renewable Wins EPC Order for 291 MWp Solar and 280 MWh BESS Project

August 31, 2026
Sachin Sehgal Joins Adani Power as Head of Administration

Sachin Sehgal Joins Adani Power as Head of Administration, Brings Extensive Operations Expertise

August 31, 2026
Livguard Strengthens Kashmir Presence

Livguard Strengthens Kashmir Presence with First Exclusive Brand Outlet in Anantnag

August 31, 2026
Tata Power Renewables Crosses 7 GW Operational Capacity

Tata Power Renewables Crosses 7 GW Operational Capacity with 100 MW Kayathar Solar Project

August 31, 2026
Batteries
Copenhagen Infrastructure Partners Expands Australian Portfolio

Copenhagen Infrastructure Partners Expands Australian Portfolio with Wind and Battery Project Acquisition

August 31, 2026
KP Green Engineering Secures rs258 Crore

KP Green Engineering Secures ₹258 Crore Orders as KPI Green Energy Accelerates Solar, Wind and BESS Expansion

August 31, 2026
SECI Floats Tender for 50 MW/100 MWh Standalone BESS

SECI Floats Tender for 50 MW/100 MWh Standalone BESS on Short-Term Basis

August 31, 2026
CATL Unveils Local Partnership

CATL Unveils Local Partnership and Full-Chain Energy Storage Solutions in South America

August 29, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.