Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Tata Power Renewables Commissions 300 MW DCR Solar Project for NHPC in Bikaner, Rajasthan
Renewable energy

Tata Power Renewables Commissions 300 MW DCR Solar Project for NHPC in Bikaner, Rajasthan

PrakashBy PrakashNovember 17, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
Tata Power Renewables Commissions 300 MW DCR Solar Project for NHPC in Bikaner, Rajasthan

Tata Power Renewable Energy Limited (TPREL), a leading player in India’s renewable energy sector and a subsidiary of The Tata Power Company Limited (‘Tata Power’), has successfully commissioned NHPC Limited’s landmark 450 MWp (DC) / 300 MW (AC) DCR-compliant solar power project as the EPC contractor at Karnisar Bhatiyan, Bikaner, Rajasthan. Executed over a span of two and a half years with unparalleled excellence in execution, the project stands as a demonstration of TPREL’s robust project management and technical capabilities.

In addition to the 300 MW NHPC project, the company is also powering Rajasthan’s upcoming clean-energy landscape with DCR-compliant cells and modules for SJVN’s 1 GW project and NLC’s 300 MW project—both poised for commissioning and set to become major renewable milestones. The plant features high-efficiency solar modules manufactured by TP Solar Ltd., Tirunelveli, further reinforcing the commitment to domestic manufacturing and sustainable energy advancement.

Developed by TPREL, this NHPC-owned large-scale solar project is supplying the entire power to PSPCL and will generate approximately 17,230 million units of green electricity over the life period of operation.

The project stands out for its robust engineering and innovative execution in one of India’s most challenging terrains. Despite extreme temperatures and difficult vehicle movements, the TPREL team ensured timely completion with the deployment of advanced technologies such as DCR cells and bifacial DCR modules, precision ramming, and high-performance inverters designed to withstand extreme heat conditions. In total, around 775,000 modules were installed for this project.

In addition to technical excellence, the project had a strong socio-economic impact. More than 300 local workers were employed, and several local vendors were developed, creating livelihood opportunities in the area and boosting the regional economy.

With this successful commissioning, TPREL reinforces its position as a trusted partner for large-scale renewable energy projects in India, delivering clean, reliable, and sustainable power to key utilities while actively contributing to India’s goal of achieving 500 GW of non-fossil fuel energy capacity by 2030 and reaching net-zero greenhouse gas emissions by 2070.

To date, the company has commissioned over 4.9 GW of third-party projects—an impressive milestone strengthened by more than 980 MW delivered in this financial year alone, showcasing its rapid execution capability.

With this project, TPREL’s total renewable utility capacity has reached 11.6 GW. Currently, 5.8 GW of this capacity is operational, comprising 4.7 GW of solar and 1.1 GW of wind energy. Additionally, 5.8 GW is under various stages of implementation, evenly split between 3 GW of solar and 2.8 GW of wind projects. These ongoing projects are expected to be completed in phases over the next 6 to 24 months in a staggered manner.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
NHPC solar modules Tata Power Renewables Wind Energy
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.