Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Vanda RE Signs Framework Supply Agreement with CATL
Batteries

Vanda RE Signs Framework Supply Agreement with CATL

PrakashBy PrakashJuly 17, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Vanda RE partners with CATL to supply 2.2 GWh of batteries for its landmark solar-plus-storage project in Indonesia’s green economic corridor

Vanda RE Pte Ltd, a joint venture company co-owned by Gurīn Energy Pte Ltd and Gentari through Gentari International Renewables Pte Ltd, today announced the signing of a major framework supply agreement with Contemporary Amperex Technology Co., Limited (CATL), a leading supplier of battery technology and battery management systems.

The agreement will see Vanda RE procure up to 2.2 gigawatt hours (GWh) of CATL’s EnerX battery energy storage system (BESS) for the Vanda Solar & Battery Project, a utility-scale solar-plus-storage development to be located in the Riau Islands, Indonesia.

CATL’s BESS will enable the project—underpinned by 2 gigawatt peak (GWp) of installed solar PV capacity and 4.4 GWh of battery storage—to meet Indonesia’s local content requirement (TKDN). The batteries will be manufactured in CATL’s factory in the Karawang regency in Indonesia’s West Java province. The factory, which broke ground at the end of June, has a total battery capacity of 15 GW.

The project is part of broader efforts by Singapore and Indonesia to develop a green economic corridor between the two neighboring countries, starting with cooperation on green energy development. Projects like Vanda RE’s will incentivize top-tier clean tech companies like CATL to invest in setting up local manufacturing facilities, boosting the development of Indonesia’s clean technology supply chains and industries. This generates a positive knock-on effect for the Indonesian economy by lowering the cost of domestic renewable energy development and boosting the attractiveness of Indonesia as a destination for sectors dependent on green energy.

“Today’s announcement is another critical milestone in the development of the landmark Vanda Solar & Battery Project. Vanda RE is committed to developing the project to the highest technical and operating standards, which is why we are delighted to have secured CATL’s best-in-class batteries.”

– Enda Ginting, Country Manager, Indonesia, of Gurīn Energy.

Today’s announcement is another demonstration of the steady progress being made in the project’s development. Earlier this year, Vanda RE signed a 1 GW framework supply agreement for solar panels and selected the Owner’s Engineer for the project.

“Our progress reflects the strong confidence that partners and stakeholders have in the project as well as the vision of a green economic corridor between Indonesia and Singapore. The Vanda project is a stepping stone to bringing that vision to life, and we are happy to do our part.”

– Enda Ginting, Country Manager, Indonesia, of Gurīn Energy.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery technology BESS CATL Gurīn Energy
Prakash
  • Website
  • LinkedIn

I am a Junior Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

Comments are closed.

Renewable energy
PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

June 4, 2026
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.