Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » ADS-TEC Energy Secures Multiple Large-Scale Battery Storage Contracts in Germany and Austria
Batteries

ADS-TEC Energy Secures Multiple Large-Scale Battery Storage Contracts in Germany and Austria

ManshiBy ManshiDecember 31, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
ADS-TEC Energy Secures Multiple Large-Scale Battery Storage Contracts in Germany and Austria

ADS-TEC Energy PLC (NASDAQ: ADSE) has closed 2025 with several new contracts for large-scale battery storage projects in Germany and Austria, reflecting strong market demand for its energy storage solutions. The contracts secured in December alone total 20 MW of power and 40 MWh of storage capacity, all of which are now in the detailed planning phase.

“Towards the end of the year, our battery energy storage business gained significant traction. These newly signed projects reflect the trust that energy utilities are placing in us. These businesses increasingly value companies with long-standing experience, proven references and strong technical execution capabilities, and, across the entire value chain, this is where we are well positioned,” said Thomas Speidel, CEO of ADS-TEC Energy.

The new contracts build on ADS-TEC Energy’s growing customer reference base in the battery energy storage market, including large-scale systems operating successfully since 2016. Notably, the Stadtwerke Ludwigsburg-Kornwestheim (SWLB) project in Germany selected a BESS5000 system with 5 MWh capacity for integration with its biomass power plant to enhance grid stability and enable participation in energy and ancillary service markets.

In early December, ADS-TEC Energy completed its first large-scale battery storage project in Austria at AAE Naturstrom, installing and commissioning a 5 MWh BESS5000 system on schedule. The project’s integration with a photovoltaic (PV) system demonstrates how locally generated solar power can be stored, marketed flexibly, and fed into the grid as needed.

Another flagship project in Germany features a 1 GW grid connection and 2 GWh storage capacity, with potential expansion to 4 GWh. “We are very satisfied with this project’s progress in 2025. The grid operator has obtained commitment for the grid connection and further planning and permissions are progressing at full speed. In 2026, we aim to reach ‘ready-to-build’ status,” added CEO Thomas Speidel. 

Large-scale battery storage is critical for systems with high renewable power penetration, helping store surplus electricity, smooth peak loads, and stabilize the grid. ADS-TEC Energy combines high-performance batteries with intelligent energy management systems, optimizing performance for energy trading, ancillary services, and renewable energy marketing, providing utilities with enhanced grid operation and energy management capabilities.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
ADS-TEC Energy battery storage projects global news renewable power Solar Power
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

Comments are closed.

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.