Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Advait Energy Transitions Wins INR 7.43 Cr EPC Order for 180 MW/360 MWh BESS Project in Gujarat
Batteries

Advait Energy Transitions Wins INR 7.43 Cr EPC Order for 180 MW/360 MWh BESS Project in Gujarat

Shweta KumariBy Shweta KumariMay 9, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Advait Energy Secures 180 MW/360 MWh BESS Project in Gujarat

Ahmedabad-based Advait Energy Transitions has secured an EPC (Engineering, Procurement, and Construction) contract worth INR 7.43 crore from Gujarat BESS for the development of a 180 MW/360 MWh Battery Energy Storage System (BESS) project in Sanand, Gujarat.

The company announced that the scope of work includes supply, erection, testing, and commissioning of the plant, with mechanical completion targeted by November 30, 2025, and final charging scheduled for December 23, 2025.

This latest win strengthens Advait’s growing portfolio in the energy transition space. Formerly known as Advait Infratech, the company has been making strategic strides in clean energy and infrastructure solutions.

In March 2025, Advait bagged a turnkey solutions contract from Adani Green Energy Six for a 100 MWac solar project at the Khavda Hybrid Renewable Power Project in Gujarat. In January 2025, it signed an MoU with Haryana City Gas Distribution (Bhiwadi) Ltd. to set up a 2,000 MTPA green hydrogen plant.

Additionally, Advait Energy Transitions received a Letter of Award (LoA) from the Solar Energy Corporation of India (SECI) under the SIGHT Scheme Tranche-II for a 200 MW alkaline electrolyser manufacturing facility. The company also won a project from Karnataka Renewable Energy Development Ltd. for integrating 40,000 off-grid solar pumps with SCADA software under the PM KUSUM Component ‘B’ scheme.

Established in 2009, Advait Energy Transitions originally focused on power transmission, substation, and telecommunication infrastructure. In 2023, it pivoted into the renewable energy sector through its subsidiaries—A&G Hydrogen Technologies, Advait Greenergy, and Advait Energy Holdings—further cementing its role in India’s energy transition journey.

“The company specialises in stringing tools, ACS wire manufacturing OPGW operations, ERS. tumkey telecom projects, live line installations, green energy, Alkaline, and PEM electrolyser systems, fuel cell systems, hydrogen refuelling station (HRS), hydrogen blending system, and hydrogen storage units, insulators, conductors, transmission line towers stringing tools, power transmission, and substation services” The Company Mentioned.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Advait Energy Transitions Battery Energy Storage System clean energy energy transition EPC Gujarat BESS
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

India Sets Out Rs 60,000-Crore Roadmap

India Sets Out Rs 60,000-Crore Roadmap to Build a Future-Ready Workforce

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.