India’s ambition with regard to electric mobility, energy storage, and advanced manufacturing is at an all-time high. Many gigafactory announcements have already made it to the news. You can see…
Author: Shweta Kumari
Tata Power is emerging as a preferred partner for India’s fast-growing data centre ecosystem, with a diversified opportunity pipeline of over 2.8 GW spanning renewable energy, transmission and distribution opportunities.…
For the better part of a decade, the narrative around electric vehicles has been dominated by a single, restrictive image: a vehicle tethered to a plug. We have measured the…
Grid Controller of India Limited (GRID-INDIA) has invited eligible Indian entities to develop indigenous, modular and interoperable Supervisory Control and Data Acquisition (SCADA) and Energy Management System (EMS) software for…
GH2 Solar Limited has signed a Power Purchase Agreement (PPA) with the Solar Energy Corporation of India Limited (SECI) for a 50 MW solar photovoltaic (PV) project paired with a…
VSL PowerHive, the battery energy storage arm of Vikram Solar, is preparing to establish a 7.5 GWh battery energy storage system (BESS) assembly plant in Chennai, Tamil Nadu, with commercial…
Tata Power and Imperial College London have signed a Memorandum of Understanding (MoU) to explore collaboration in energy storage, grid flexibility, AI-driven energy systems and industrial decarbonisation, bringing together India’s…
West Bengal State Electricity Distribution Company Limited (WBSEDCL) has invited bids for the development of a 50 MW solar photovoltaic (PV) project integrated with a 10 MW/40 MWh battery energy…
Meghalaya Energy Corporation Limited (MeECL) and The Energy and Resources Institute (TERI) have signed a three-year Memorandum of Understanding (MoU) to strengthen Meghalaya’s renewable energy sector, assess energy storage requirements,…
Power Grid Corporation of India Limited (POWERGRID) has invited bids for the development of a 187.5 MW/750 MWh battery energy storage system (BESS) in Telangana under Package TS-BESS-01. The four-hour…











