Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » BluPine Energy Signs PPA with SECI for 150 MW Solar and Energy Storage Project in Rajasthan
Batteries

BluPine Energy Signs PPA with SECI for 150 MW Solar and Energy Storage Project in Rajasthan

Shweta KumariBy Shweta KumariApril 18, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
BluPine, SECI Ink PPA for Solar Project in Rajasthan

BluPine Energy, through its special purpose vehicle Solarcraft Power India 8 Private Limited, has signed a Power Purchase Agreement (PPA) with the Solar Energy Corporation of India (SECI) for the development of a 150 MW solar power project integrated with a 1,000 MW/4,000 MWh Energy Storage System (ESS) in Bikaner, Rajasthan. The project forms a crucial part of SECI’s broader initiative to procure 2,000 MW of renewable energy from ISTS-connected solar power projects combined with advanced energy storage solutions. Aligned with India’s national goal of achieving 500 GW of non-fossil fuel-based energy capacity by 2030, this initiative supports the Ministry of Power’s recent mandate for storage-backed renewable energy, aimed at tackling intermittency and ensuring round-the-clock power supply. With this PPA, BluPine Energy is poised to contribute significantly to strengthening India’s grid stability and accelerating its clean energy transition.

“We are deeply committed to powering India’s decarbonization journey through reliable, round-the-clock renewable energy. The PPA with SECI highlights our ability to pivot with agility as India’s renewable powered grids become resilient. Our 150 MW solar project with integrated energy storage in Rajasthan is designed to deliver firm and dispatchable clean power—addressing intermittency and enhancing grid stability. By integrating cutting-edge solar technology with advanced storage solutions, we are not only meeting today’s energy demands but also shaping a sustainable energy future for India,” said Neerav Nanavaty, CEO, BluPine Energy.

The Ministry of Power’s mandate for energy storage integration in February 2025, is specifically designed to resolve intermittency issues and provide critical support during peak demand hours, ensuring grid stability, reliability, and optimal energy utilization.

The project was secured through SPV Solarcraft Power India 8 Private Limited during SECI’s competitive bidding process initiated under RfS No. SECI/C&P/IPP/11/0011/24-25 dated July 31, 2024.

​BluPine Energy, established in 2021 by global investor Actis, is a leading renewable energy platform in India. Headquartered in Gurugram, Haryana, the company is committed to developing over 4 GW of renewable energy projects, encompassing solar, wind, and energy storage solutions. With a substantial investment of $800 million from Actis’ Energy Fund 5, BluPine Energy focuses on delivering comprehensive, cost-effective, and sustainable low-carbon solutions to a diverse clientele, including state and central utilities, commercial buildings, industries, and communities across India.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
cleanpower EnergyStorage EnergyTransition GreenEnergy GridStability IndiaEnergy RenewableEnergy SECI SolarPower sustainablefuture
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.