Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Ceigall India Wins ₹1,700 Crore Solar-BESS Project at Morena Solar Park
Batteries

Ceigall India Wins ₹1,700 Crore Solar-BESS Project at Morena Solar Park

ManshiBy ManshiFebruary 10, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Ceigall India Wins ₹1,700 Crore Solar-BESS Project at Morena Solar Park

Ceigall India Limited has bagged an important renewable energy deal as it has been awarded the Letter of Award (LoA), which was dated 9 February 2026, by Rewa Ultra Mega Solar Limited (RUMSL). The award was based on the development of Unit 1, which had the capacity of 220 MW located at the Morena Solar Park in the state of Madhya Pradesh.

The project is awarded through a competitive tariff-based bid, and it is a solar power project with a capacity of 220 MW integrated with a Battery Energy Storage System (BESS). Ceigall India quoted a tariff rate of ₹2.70 per kWh for this power project. The total value for this power project is estimated at approximately ₹1,700 crore, including GST.

Project Scope and Timeline

It is expected to be completed in 24 months and would operate for 25 years. When commissioned, the project would add significantly to Madhya Pradesh’s renewable energy capacity and contribute towards India’s larger clean energy and decarbonisation objectives.

Morena Solar Park is one of the important renewable energy projects in the region and has been designed to provide greater grid stability using energy storage technologies. The inclusion of a Battery Energy Storage System, together with the solar energy generation system, will result in efficient peak power management.

Company Perspective

Commenting on the development, Ramneek Sehgal, Chairman & Managing Director, Ceigall India Limited, said:

“We are pleased to secure the 220 MW Solar and BESS project at Morena Solar Park from Rewa Ultra Mega Solar Limited. As India progresses toward its 500 GW non-fossil capacity target, integrated solar and storage solutions are essential for delivering reliable, dispatchable renewable power. This project strengthens our presence in the clean energy segment, and we are committed to executing it efficiently while supporting India’s energy transition and decarbonisation objectives.”

Strategic Significance

This new order is the latest addition to reinforcing Ceigall India’s increasing order book and is seen as a strategic move towards the company’s foray into large-scale renewable energy infra projects. While traditionally the company had been associated with transportation infra projects, the increasing association with the clean and green energy sphere is in line with the company’s vision to contribute to nation-building in the sphere of both energy and infra segments.

With this project, Ceigall India strengthens its role in supporting India’s transition toward a more sustainable and resilient energy system.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
AeroCare Clean Energy Battery Energy Storage System Ceigall India Limited energy storage technologies India News renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.