Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » Chhattisgarh Discom Launches 760 MWh Battery Energy Storage Pilot Tender
Tenders

Chhattisgarh Discom Launches 760 MWh Battery Energy Storage Pilot Tender

Shweta KumariBy Shweta KumariSeptember 8, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Chhattisgarh

Chhattisgarh State Power Distribution Company Limited (CSPDCL) has issued a Request for Selection (RfS) for the development of a 380 MW/760 MWh standalone Battery Energy Storage System (BESS) under a Build-Own-Operate (BOO) model. The project aims to enhance grid stability and integrate renewable energy sources efficiently. Bids are open until September 30, 2025.

Project Overview

  • Capacity: 380 MW / 760 MWh (2-hour duration)
  • Location: 36 substations across Chhattisgarh, including Raipur, Baloda Bazar, Bilaspur, Raigarh, Janjgir-Champa, Durg, Bemetara, Balod, Mahasamund, Surajpur, and Rajnandgaon districts. Each substation is designated as a project unit within one of six packages.
  • Model: Build-Own-Operate (BOO)
  • Offtaker: CSPDCL
  • PPA Tenure: 12 years
  • Operational Cycles: 2 complete charging and discharging cycles per day
  • Commissioning Period: 18 months from the effective date of the Battery Energy Storage Purchase Agreement (BESPA)
  • Financial Closure: 12 months after the effective date of BESPA

Key Technical and Performance Parameters

  • Charging Power: Provided by CSPDCL at the delivery point
  • Minimum Availability: 95% on an annual basis; shortfall subject to Liquidated Damages (LD) at 2 times the charges
  • Monthly Availability: 95%; shortfall subject to LD linked to the Average Power Purchase Cost (APPC) tariff
  • Allowed Degradation: 2.5% annually
  • Land Provision: Provided on a Right-of-Use (RoU) basis by CSPDCL within 60 days from the effective date of BESPA

Bidder Requirements:

  • Tender Fee: ₹29,500
  • Earnest Money Deposit (EMD): ₹2.20 lakh per MW
  • Performance Bank Guarantee (PBG): ₹11 lakh per MW prior to signing of BESPA

Tender Documents and Submission

  • Submission Portal: All bids must be submitted through the official e-Bidding portal at CSPDCL e-Bidding
Capacity 380 MW / 760 MWh (2-hour duration), minimum bid size 100 MWh
Location 36 substations across Chhattisgarh, grouped into 6 packages; each substation treated as a project unit.
Last Date 30/09/2025
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BatteryStorage BESS Chhattisgarh EnergyStorage GridStability RenewableEnergy
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Comments are closed.

Renewable energy
Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

July 20, 2026
Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

July 20, 2026
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
Batteries
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.