Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Cygni Energy Launches ₹100 Cr Automated BESS Gigafactory in Hyderabad
Batteries

Cygni Energy Launches ₹100 Cr Automated BESS Gigafactory in Hyderabad

Shweta KumariBy Shweta KumariMay 1, 20254 Mins Read
Facebook Twitter LinkedIn WhatsApp
Cygni Energy Opens ₹100 Cr BESS Gigafactory in Hyderabad

The Hyderabad-headquartered Cygni Energy, India’s largest independent energy storage solutions company, announced today the commencement of its Phase-I, fully operational and automated Battery Energy Storage System (BESS) Gigafactory. Located in E-Mobility Valley, at the Electronics Manufacturing Clusters (EMC) Maheshwaram, Hyderabad, it is also India’s first “Leadership in Energy and Environmental Design” (LEED) qualified facility equipped with an Advanced Engineering Lab and Battery Management System (BMS) Lab.

Set up with an investment of over ₹100 crores, the 1,60,000 sq. ft Phase-I facility is located on a 5-acre campus and is designed with an initial capacity to produce 4.8 GWh of high-capacity battery packs for electric vehicles and energy storage systems. These advanced BESS systems will cater to large grid-scale stationary storage projects and Independent Power Producers (IPPs).

Shri. Jayesh Ranjan, Special Chief Secretary to Government of Telangana, and CEO Industry & Investment Cell in CMO, unveiled the first phase in the presence of Prof. Ashok Jhunjhunwala, Chairman, IIIT-Hyderabad, Mr. Srini Raju, Founder, iLabs Group, alongside many industrialists and the leadership team of Cygni on Wednesday.

In his address Shri. Jayesh Ranjan commended Cygni for completing its first milestone and setting up the BESS Gigafactory. “The inauguration of Cygni’s battery manufacturing gigafactory in Telangana marks a transformative step toward sustainable energy, manufacturing excellence, and innovation. This facility not only strengthens India’s commitment to clean energy but also creates jobs, fosters local talent, and builds a robust ecosystem for the future of energy storage solutions”.

Venkat Rajaraman, Founder and CEO of Cygni said, “This Gigafactory positions us to lead in the energy storage sector, delivering high-quality, safe battery packs across multiple applications. Cygni’s Automated BESS Assembly Line is engineered for advanced, high-quality BESS module manufacturing, leveraging globally recognized best practices such as Poka-Yoke-enabled stations and end-to-end traceability. We plan to grow exponentially in energy storage over the next few years in India and internationally”.

“In Phase II, we are scaling our Gigafactory’s capacity to 10.8 GWh in the existing facility itself. With a total investment of Rs. 250 Cr across 2 phases, this will result in direct and indirect job creation of over 1,000 jobs in the next 24 months. As part of this expansion, we will be adding three additional automated 2 GWh cell-to-pack manufacturing lines and container integration facilities to our existing lines, to meet the rising demand for stationary and e-mobility storage applications.” Rajaraman added.

Going forward, Cygni will provide advanced high-capacity energy storage solutions featuring modular, scalable designs and integrated with Machine Learning for predictive analysis, Digital Twin technology for real-time monitoring, high-performance energy management systems, seamless smart grid-code integration, and precision-engineered manufacturing. It also leverages research on futuristic technologies and battery chemistries through its long-term partnership with IIT-Madras, such as Cell-to-Pack (CTP) and Cell-to-Chassis (CTC) Design Architectures, sodium-ion batteries, and super-capacitors.

Cygni has manufactured and delivered 500 MWh of batteries for the power and energy segment. Currently, it has a pipeline of 1 GWh in orders for BESS projects and EV battery packs, backed by a nationwide service network and an experienced project commissioning team.

This production line is capable of manufacturing 105kWh liquid cooled base modules using advanced 314Ah cells, serving as the fundamental building blocks for nearly all energy storage containers worldwide. The Manufacturing Execution System (MES) Software in this BESS manufacturing line ensures seamless production monitoring, real-time data analytics, quality control, and enhanced traceability, driving operational efficiency and product reliability.

Ongoing R&D at the Gigafactory will include development of innovative energy storage solutions with Sodium-ion chemistry, thermal management strategies to improve safety, and advanced Energy Management System (EMS) algorithms to cater to evolving grid-code and design of India specific energy storage solutions.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage clean technology energy transition EV batteries green energy
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.