Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Energy Vault Signs Agreement With Jupiter Power for 100 MW/200 MWh BESS
Batteries

Energy Vault Signs Agreement With Jupiter Power for 100 MW/200 MWh BESS

PrakashBy PrakashJune 6, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
Energy Vault and Jupiter Power are expanding their partnership with a new 100 MW/200 MWh battery storage project in Texas.

Energy Vault Holdings Inc., a leader in sustainable, grid-scale energy storage solutions, and Jupiter Power (“Jupiter”), a leading developer and operator of utility-scale battery energy storage projects in the United States, have announced the signing of an agreement for the supply of an additional battery energy storage system (BESS) at a Jupiter site in the Electric Reliability Council of Texas (ERCOT) region. Today’s announcement follows the July 2024 completion of an initial 100 MW/200 MWh BESS.

This new BESS will add 100 MW/200 MWh of critical dispatchable capacity to the ERCOT grid, further advancing grid resiliency. Construction of the project is underway, with commercial operations expected to commence by the end of this summer.

The BESS system will be built with the Energy Vault’s proprietary X-Vault integration platform using Energy Vault’s proprietary UL9540-certified B-VAULT product and VaultOS Energy Management System to control, manage, and optimize the BESS operations. Energy Vault’s innovative system architecture provides customer optionality with both battery and inverter suppliers, while unique AC-coupled and DC-coupled configurations provide the drop-in flexibility needed for any project.

“As one of the largest battery storage developers and operators in the U.S., we look for partners who can keep pace with our ambition and scale. With more than 2,500 MWh in operation or construction, we’re excited to continue building with Energy Vault at this critical site and appreciate their ability to deliver solutions tailored to our needs.”

– Michael Geier, Chief Technology Officer, Jupiter Power.

“Today’s expansion of our partnership with Jupiter Power stands as a testament to the strength of our team’s collaborative approach to delivering reliable, safe, and efficient energy storage solutions to customers. Jupiter’s BESS projects portfolio has reached a critical mass in ERCOT, and we’re proud to continue serving as a partner to Jupiter Power in the ultimate endeavor to decarbonize the grid in an economically effective fashion.”

– Marco Terruzzin, Chief Commercial and Product Officer, Energy Vault.

Today’s announcement serves as yet another milestone in the ongoing partnership between Energy Vault and Jupiter Power, which began in 2022 with the announcement of an agreement to secure 2.4 GWh of supply chain equipment and services that will be integrated and delivered through Energy Vault’s hardware and software management platform in Jupiter Power’s battery energy storage projects. To date, Energy Vault’s B-VAULT portfolio consists of more than 2 GWh in total projects either deployed or currently in development.

Energy Vault develops, deploys, and operates utility-scale energy storage solutions designed to transform the world’s approach to sustainable energy storage. The company’s comprehensive offerings include proprietary battery, gravity, and green hydrogen energy storage technologies supporting a variety of customer use cases, delivering safe and reliable energy system dispatching and optimization. Each storage solution is supported by the company’s technology-agnostic energy management system software and integration platform. Unique to the industry, Energy Vault’s innovative technology portfolio delivers customized short, long, and multi-day/ultra-long duration energy storage solutions to help utilities, independent power producers, and large industrial energy users significantly reduce levelized energy costs while maintaining power reliability.

Jupiter Power is a leading energy storage infrastructure platform with extensive capabilities in trading, analytics, development, finance, operations, and construction. The company is developing approximately 12,000 MW of utility-scale energy storage projects from California to Maine. Jupiter Power is headquartered in Austin, Texas, with offices in Houston and Chicago.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
B VAULT BESS Energy Vault green hydrogen
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

Comments are closed.

Renewable energy
Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

July 20, 2026
Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

July 20, 2026
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
Batteries
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.