Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » India Achieves 2,361 MW Biomass, 228 MWe Waste-to-Energy, 2.88 Lakh Biogas Growth
Renewable energy

India Achieves 2,361 MW Biomass, 228 MWe Waste-to-Energy, 2.88 Lakh Biogas Growth

ManshiBy ManshiDecember 18, 20254 Mins Read
Facebook Twitter LinkedIn WhatsApp
India Achieves 2,361 MW Biomass, 228 MWe Waste-to-Energy, 2.88 Lakh Biogas Growth

Union Minister of State for New and Renewable Energy, Shri Shripad Yesso Naik, submitted a written report in the Lok Sabha stated that the Ministry of New and Renewable Energy (MNRE) is actively supporting bioenergy projects across India under the National Bioenergy Programme (NBP) Phase-I, launched on 2nd November 2022, with a total outlay of ₹998 crore for 2022-23 to 2025-26.

Over the past decade, the government has promoted bioenergy through schemes such as the National Biogas and Manure Management Programme (NBMMP), New National Biogas & Organic Manure Programme (NNBOMP), biomass-based cogeneration in sugar mills, and energy generation from urban, industrial, and agricultural waste.

State-wise details of bioenergy projects installed over the last ten years are documented, and new projects are being implemented under NBP Phase-I to expand renewable energy capacity nationwide.

Annexure-I

The existing CFA Support for setting up of Bioenergy Projects in the country under National Bioenergy Programme is given as under:

Waste to Energy Programme CFA in Rs Crore
Biogas generation Rs 0.25 Crore per 12000cum/day
BioCNG generation Rs 4.0 Crore per 4800 kg/day (for BioCNG generation from new biogas plant)

Rs 3.0 Crore per 4800 kg/day (for BioCNG generation from existing Biogas plant)

Power generation based on Biogas Rs 0.75 Crore/MW (for power generation from new biogas plant)

Rs 0.5 Crore/MW (for power generation from existing Biogas plant)

Power based on bio & agro-industrial waste Rs 0.4 Crore/MW
Biomass Gasifier Rs. 2,500 per kWe with dual fuel engines for electrical application

Rs. 15,000 per kWe with 100% gas engines for electrical application

Rs. 2 lakh per 300 kWth for thermal applications

Biomass Programme CFA
Briquette manufacturing plants Rs. 9.00 Lakhs/ TPH

(Maximum CFA- Rs. 45.00 Lakh per project).

Non-Torrefied Pellet manufacturing plant Rs. 21 lakhs/MTPH production capacity or 30% of the capital cost considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 105 lakhs per project)

 

Torrefied Pellet manufacturing plant Rs. 42 lakhs/MTPH production capacity or 30% of the capital cost considered for plant and machinery of 1 TPH plant, whichever is lower (Maximum Rs. 210 lakhs per project)

 

Non-Bagasse Cogeneration Projects Rs. 40 Lakhs/ Megawatt

Maximum CFA- Rs. 5.00 Crore per project).

Biogas Programme CFA
For small biogas plants (1-25 cubic meter/day plant capacity): Rs. 9,800/- to Rs. 70,400/- per plant based on size of the plant in cubic meter
For Power generation and thermal application (25 – 2500 cubic meter/day plant capacity): Rs. 35,000/- to Rs. 45,000/- per kilowatt for power generation

Rs. 17,500/- to Rs. 22,500/- per kilowatt equivalent for thermal applications.

 

Note: 20% higher than Standard CFA in for NER, Island, Registered Gaushalas and SC/ST beneficiaries);

Annexure-II

The details of bioenergy projects installed in the country during the last ten years is given as under:

Biomass Projects Waste to Energy Projects Biogas Plants
Sl No State Capacity (MW) Capacity (MWe) Nos
1 Andhra Pradesh 35.1 35.95 28505
2 Arunachal Pradesh 0 0 349
3 Assam 2 0 23612
4 Bihar 39.8 0.32 236
5 Chhattisgarh 54 0 11030
6 Goa 0 1 140
7 Gujarat 12 15.2 5427
8 Haryana 87.4 17.39 3487
9 Himachal Pradesh 1.5 0 294
10 Jharkhand 14.8 1.04 545
11 Karnataka 536.81 8.41 34657
12 Kerala 1.55 0.23 9639
13 Madhya Pradesh 31.2 5.86 32120
14 Maharashtra 1073.5 24.26 71653
15 Manipur 0 0 25
16 Meghalaya 0 0 867
17 Mizoram 0 0 648
18 Nagaland 0 0 102
19 Odisha 0.6 0 5966
20 Punjab 140.29 21.77 19288
21 Rajasthan 19.85 1.19 2404
22 Sikkim 0 0 170
23 Tamil Nadu 112.55 8.68 1740
24 Telangana 4.03 9.79 11159
25 Tripura 0 0 546
26 Uttarakhand 12.5 6.89 8362
27 Uttar Pradesh 146.6 41.34 3594
28 West Bengal 31.6 4.06 851
29 Andaman and Nicobar Islands 0 0 0
30 Chandigarh 0 0 0
31 Dadra and Nagar Haveli and Daman & Diu 3.75 0 18
32 NCT of Delhi 0 24.17 0
33 Jammu & Kashmir 0 0 101
34 Ladakh 0 0 0
35 Lakshadweep 0 0 0
36 Puducherry 0 0 0
37 Others 0 0 10544
Total 2361.43 227.56 288079

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.

biomass clean energy India News MNRE renewable energy Waste-to-Energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Comments are closed.

Renewable energy
Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

July 20, 2026
Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

July 20, 2026
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
Batteries
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.