Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Jakson Group Inaugurates ₹8,000 Crore 6 GW Solar Manufacturing Hub in Madhya Pradesh
Renewable energy

Jakson Group Inaugurates ₹8,000 Crore 6 GW Solar Manufacturing Hub in Madhya Pradesh

PrakashBy PrakashNovember 18, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
Jakson Group Inaugurates ₹8,000 Crore 6 GW Solar Manufacturing Hub in Madhya Pradesh

In a landmark moment for India’s renewable energy sector, the Hon’ble Chief Minister of Madhya Pradesh, Dr. Mohan Yadav, laid the foundation stone (Bhoomi Poojan) for Jakson Group’s first phase of 6 GW Integrated Solar Ingot, Wafer, Cell, and Module Manufacturing Facility at Maksi Phase II, Ujjain District.

The event was held at the 113.5-acre project site in Maksi and witnessed the presence of senior dignitaries from the Madhya Pradesh Government. Representing the Jakson Group were Mr. Sameer Gupta, Chairman, and Mr. Sundeep Gupta, Vice Chairman, along with members of the leadership team.

Hon’ble CM Dr. Mohan Yadav, Government of Madhya Pradesh, expressed, “This is a proud moment for Madhya Pradesh, reaffirming the success of our progressive and investor-friendly policies. The solar manufacturing hub at Maksi will create skilled jobs for our youth and position our state as the manufacturing and logistics center of India’s clean energy transition. It reflects Madhya Pradesh’s strength as a growth-focused state with skilled talent and robust infrastructure, while advancing the nation’s vision of Aatmanirbhar Bharat.”

Mr. Sameer Gupta, Chairman, Jakson Group, said, “The Bhoomi Poojan at Maksi marks a monumental milestone in Jakson Group’s 78-year journey and reinforces our unwavering commitment to ‘Make in India.’ This integrated solar manufacturing facility will drive technological self-reliance from the heart of India and strengthen the nation’s clean energy manufacturing capabilities. We are deeply grateful for the visionary leadership of the Madhya Pradesh Government, whose continued encouragement and support has made this possible.”

Mr. Sundeep Gupta, Vice Chairman, Jakson Group, “Vertical integration is the key to India’s energy independence, enabling cost efficiencies, technological advancement, and resilience against global supply disruptions. Supported by the progressive policies of the Madhya Pradesh Government and the national renewable energy roadmap, Jakson’s solar business is poised to drive innovation and accelerate India’s transition towards a sustainable and carbon-neutral future.”

With an investment of over ₹8,000 crore, the facility is the largest solar manufacturing initiative in Madhya Pradesh and a major step towards achieving India’s target of 500 GW renewable capacity by 2030 and Net Zero by 2070.

In Phase I, Jakson will establish a 3 GW solar cell and 4 GW solar module manufacturing facility, followed by backward integration into ingot and wafer production in subsequent phases. The project will also help develop a robust solar manufacturing ecosystem in Madhya Pradesh, fostering supply chain and ancillary industry growth.

Jakson Group already has a strong presence in the state with a 150 KLPD grain-based ethanol manufacturing plant in Balaghat. The upcoming solar manufacturing facility further strengthens this partnership with the state and underscores Jakson’s long-term commitment to advancing India’s clean energy and self-reliance goals.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy Jakson Group renewable energy solar manufacturing
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

Comments are closed.

Renewable energy
Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

July 21, 2026
GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

July 21, 2026
India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

July 21, 2026
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Batteries
Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.