Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Juniper Green Energy Begins Commissioning of India’s First FDRE Project
Renewable energy

Juniper Green Energy Begins Commissioning of India’s First FDRE Project

ManshiBy ManshiApril 20, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Juniper Green Energy Begins Commissioning of India’s First FDRE Project

Juniper Green Energy Limited has initiated the commissioning of what is being described as India’s first firm and dispatchable renewable energy (FDRE) project, marking a significant milestone in the country’s evolving clean energy landscape.

Across Rajasthan and Gujarat, the project includes 259 MWp of solar power, 280 MW of wind power, and a 200 MWh battery energy storage system (BESS). The hybrid setup is meant to provide scheduled renewable power that matches grid demand, which solves the problems of intermittent power generation that come with using only solar or wind power.

“This marks the start of India’s first Firm and Dispatchable Renewable Energy project,” said Ankush Malik, CEO of Juniper Green Energy Limited.

Aligning Renewable Energy with Grid Demand

The development follows the introduction of FDRE guidelines by the Ministry of Power in June 2023. These guidelines mandate the integration of solar, wind, and energy storage into a single system capable of supplying firm and scheduled power to distribution companies.

As India’s renewable energy capacity grows, grid stability has become a major issue because solar and wind output can change. FDRE projects try to lessen these changes by combining different sources of generation with storage.

Solar and Storage Components Operational

The solar component of the project, with a capacity of 259 MWp, commenced commercial operations in March 2026. This was followed by the commissioning of the 200 MWh battery energy storage system in April 2026, enhancing the project’s ability to deliver dispatchable power.

The project was awarded under a tender floated by SJVN Limited. Juniper Green Energy has signed a 200 MW power purchase agreement (PPA) with SJVN, which has a back-to-back agreement with the Haryana Power Purchase Centre for electricity supply.

Growing Momentum in FDRE Segment

Since the FDRE guidelines were put in place, agencies like NHPC, SECI, and NTPC have put out more than 10 tenders worth more than 14 GW. About 10 GW of this work is currently being done.

Headquartered in Delhi NCR, Juniper Green Energy is an independent power producer with an operational capacity of around 1.66 GWp as of January 2026. The company is part of the AT Capital Group, a Singapore-based investment firm. Juniper Green Energy’s FDRE project highlights the growing role of FDRE solutions in delivering reliable renewable power across India.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS energy storage FDRE India News Juniper Green Energy Limited renewable energy Solar Power wind power
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

Leave A Reply Cancel Reply

5 × five =

Renewable energy

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

October 16, 2026
NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

October 16, 2026
Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

October 16, 2026
Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

October 16, 2026
Batteries
Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

October 16, 2026

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

October 16, 2026
Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

October 16, 2026
NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

October 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.