Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » KPI Green Energy Subsidiary Receives LoI for 445 MW/890 MWh Standalone BESS Projects in Gujarat
Batteries

KPI Green Energy Subsidiary Receives LoI for 445 MW/890 MWh Standalone BESS Projects in Gujarat

ManshiBy ManshiJanuary 5, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
KPI Green Energy Subsidiary Receives LoI for 445 MW/890 MWh Standalone BESS Projects in Gujarat

KPI Green Energy, part of the KP Group, has announced that its subsidiary Sun Drops Energia Private Limited has received a Letter of Intent (LoI) from Gujarat Urja Vikas Nigam Limited (GUVNL) for the development of self-owned, independent power producer (IPP) standalone Battery Energy Storage System (BESS) projects with an aggregate capacity of 445 MW/890 MWh. The projects will be developed across multiple locations in Gujarat.

The LoI has been issued pursuant to a tariff-based competitive bidding process under Phase-VII, supported by Viability Gap Funding (VGF) through the Power System Development Fund (PSDF), the company said in a regulatory filing.

The award marks two key milestones for KPI Green Energy: its maiden utility-scale IPP BESS project and its first BESS project awarded by a major government body. The development represents the group’s formal entry into the utility-scale battery energy storage segment, adding a strategic new asset class to its existing renewable energy portfolio, which includes solar, wind, and hybrid power projects.

Standalone BESS projects are grid-connected energy storage facilities that operate independently of any specific solar or wind power plant. These systems are used by utilities to store electricity during off-peak periods and discharge power during peak demand, supporting grid stability and renewable energy integration.

“Standalone BESS projects of this scale are emerging as critical infrastructure for grid reliability, peak power management, and renewable energy integration, and the award underscores the company’s expanding capabilities across emerging clean energy segments,” the company said.

The company further confirmed that it has complied with its disclosure obligations under Regulation 30 of the SEBI Listing Obligations and Disclosure Requirements (LODR) Regulations, 2015. The project involves no related-party transactions, and the promoter group has no interest in the awarding entity. The execution timeline will follow the project schedule and terms outlined in the Battery Energy Storage Purchase Agreement.

The development positions KPI Green Energy to capitalise on the growing demand for grid-scale energy storage solutions as renewable energy penetration continues to rise across India’s power sector, while strengthening its participation in policy-backed clean energy infrastructure projects.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS GUVNL hybrid power projects India News KP Group KPI Green Energy renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.