Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » KPI Green Energy Subsidiary Secures Gujarat BESS Project
Battery Manufacturing (BESS)

KPI Green Energy Subsidiary Secures Gujarat BESS Project

Sanjana NegiBy Sanjana NegiMay 25, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
KPI Green Energy

KPI Green Energy gained over 4 per cent in intraday trade after the company announced that its subsidiary, Sun Drops Energia, has signed a Battery Energy Storage Purchase Agreement (BESPA) with Gujarat Urja Vikas Nigam Limited for a standalone battery energy storage system (BESS) project in Gujarat.

The scrip opened at Rs. 423.25 and has touched a high and low of Rs. 440.65 and Rs. 421.85 respectively. So far 29173 shares were traded on the counter.

The BSE group ‘A’ stock of face value Rs. 5 has touched a 52 week high of Rs. 562.60 on 16-Jul-2025 and a 52 week low of Rs. 335.80 on 09-Mar-2026.

Last one week high and low of the scrip stood at Rs. 507.15 and Rs. 406.30 respectively. The current market cap of the company is Rs. 8658.34 crore.

The promoters holding in the company stood at 49.49%, while Institutions and Non-Institutions held 8.87% and 41.65% respectively.

KPI Green Energy’s subsidiary — Sun Drops Energia has executed the Battery Energy Storage Purchase Agreement (BESPA) with Gujarat Urja Vikas Nigam (GUVNL). The agreement involves development of a self-owned IPP Standalone Battery Energy Storage System (BESS) Project having an aggregate capacity of 120 MW / 240 MWh. This BESPA has been executed subsequent to the earlier executed 445 MW / 890 MWh BESPA with GUVNL, thereby taking the Group’s cumulative executed standalone BESS portfolio to 565 MW / 1,130 MWh. The BESPA has been executed pursuant to the tariff-based competitive bidding process conducted by GUVNL under Phase-VIII, supported by Viability Gap Funding (VGF) through the Power System Development Fund (PSDF).

Under the terms of the BESPA, Sun Drops Energia will develop, own and operate the Standalone BESS Project at locations in the vicinity of 220kV Gariyadhar AIS Substation (65 MW / 130 MWh) and 220kV Otha AIS Substation (55 MW / 110 MWh) in the State of Gujarat and make the contracted battery energy storage capacity available to GUVNL on a long-term basis. The execution of the present BESPA further strengthens the Group’s presence in the utility-scale BESS segment, while continuing to expand its footprint across emerging renewable energy infrastructure opportunities.

KPI Green Energy said the latest agreement further strengthens the group’s position in the utility-scale battery storage segment and expands its renewable energy infrastructure portfolio. The company, formerly known as K.P.I. Global Infrastructure, operates as a solar power producer under the ‘Solarism’ brand and also provides renewable energy solutions for captive power producer (CPP) customers as part of the KP Group.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESPA BESS CPP India News KPI Green Energy
Sanjana Negi
  • Website

News contributor at The Battery Magazine. I write on the latest developments in battery technology, energy storage solutions, and power innovations. Committed to delivering accurate and timely updates from the world of batteries.

Keep Reading

NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

Leave A Reply Cancel Reply

three × 3 =

Renewable energy
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Kyro Capital

Kyro Capital Launches ₹100 Crore Pre-IPO Fund Targeting Renewable Energy and Growth Sectors

June 3, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.