Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » EV & Charging » MobiLane Partners with Ather Energy to Expand Open EV Charging Access Across India
EV & Charging

MobiLane Partners with Ather Energy to Expand Open EV Charging Access Across India

ManshiBy ManshiApril 15, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
MobiLane Partners with Ather Energy to Expand Open EV Charging Access Across India

MobiLane, one of India’s fast-scaling EV charging infrastructure companies, announced a strategic partnership with Ather Energy, the country’s leading smart electric scooter manufacturer. As part of this integration, Ather users will gain seamless access to MobiLane’s network of charging points across Country, directly through the Ather Grid and MobiLane App.

This collaboration marks a significant step toward building interoperable, OEM-agnostic EV charging infrastructure in India, improving accessibility and reducing range anxiety for riders across urban and intercity routes.

Unlocking Seamless Charging for Riders

With this integration, Ather riders can discover and use MobiLane chargers without switching platforms or managing multiple accounts. MobiLane’s network spans high-density urban locations, key intercity corridors, and premium commercial hubs enabling a more reliable and convenient charging experience.

Leadership Commentary

Devansh Shah, Founder, MobiLane, added: “We are building MobiLane as a platform that enables the entire EV ecosystem – OEMs, fleets, and infrastructure players – to collaborate and scale together. This partnership with Ather is just the beginning, and we are actively looking to work with more OEMs and partners who share this vision of a connected and interoperable future.”

Gunjan Mehta, Founder, MobiLane, said:”Our vision is to build India’s most accessible and interoperable EV charging network. This partnership with Ather is a strong validation of that approach. As EV adoption accelerates, open networks will be critical in ensuring convenience and confidence for users, regardless of the vehicle they choose.”

Aravind Balagi Prasad, Head-EV Charging, Ather Energy, said: “At Ather, our focus has always been on delivering a seamless ownership experience. Expanding access to reliable charging infrastructure is key to that journey. Our partnership with MobiLane strengthens the Ather Grid with high-quality locations across cities and highways, enabling greater flexibility and confidence for our riders.”

A Larger Shift Toward Open EV Infrastructure

The MobiLane – Ather partnership reflects a broader shift in India’s EV ecosystem – from closed, brand-specific networks to collaborative, interoperable infrastructure.

This approach not only enhances utilization of existing assets but also accelerates EV adoption by making charging more accessible, predictable, and user-friendly.

MobiLane is positioning itself as a neutral, scalable charging platform – designed to integrate with multiple OEMs, fleet operators, and digital ecosystems.

Scaling Ahead: 1,000+ Charging Points Roadmap

MobiLane currently operates 250+ charging points across 40+ cities and is rapidly expanding. The company plans to scale to 1,000+ charging points across 100+ cities over the next 12–18 months, focusing on:

  • High-density urban clusters
  • Key EV corridors and highways
  • Strategic OEM and fleet partnerships

The Ather integration is being rolled out in phases, with priority locations already live and full network access expected within the next 12 months.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Ather Energy charging points EV charging infrastructure EV ecosystem India News
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

Leave A Reply Cancel Reply

16 − twelve =

Renewable energy
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

GE Vernova and POWERGRID Advance Power Infrastructure with Chandrapur HVDC Upgrade

July 20, 2026
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

Exide Infuses ₹100 Crore into EESL to Accelerate Bengaluru Lithium-Ion Cell Manufacturing Project

July 20, 2026
Batteries
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026
MoSPI Dashboard: India's Energy Storage Needs to Reach 888 GWh by FY2035–36

MoSPI Dashboard: India’s Energy Storage Needs to Reach 888 GWh by FY2035–36

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.