Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » NLC India Partners with Gujarat Government for ₹25,000 Crore Renewable Energy Initiative
Renewable energy

NLC India Partners with Gujarat Government for ₹25,000 Crore Renewable Energy Initiative

ManshiBy ManshiJanuary 14, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
NLC India Partners with Gujarat Government for ₹25,000 Crore Renewable Energy Initiative

NLC India Limited (NLCIL) has announced a strategic partnership with the Government of Gujarat to develop large-scale renewable energy projects. The collaboration, formalized through a Memorandum of Understanding (MoU), involves an estimated ₹25,000 crore investment, marking one of the most significant green energy initiatives in the state this year. The MoU was signed during the Vibrant Gujarat Regional Conference for the Saurashtra and Kutch region in Rajkot.

Scope of the Agreement

The partnership aims to diversify Gujarat’s energy mix by building extensive capacity across multiple green technologies. The project pipeline includes:

  • Solar and wind power
  • Hybrid systems
  • Battery Energy Storage Systems (BESS)

These projects will be led by NLC India Renewables Limited (NIRL), a wholly-owned subsidiary dedicated to NLCIL’s clean energy portfolio. The MoU was executed by Devendra Pratap Singh, CEO of NIRL, and Bhakthi Shamal, Joint Secretary of the Energy & Petrochemicals Department, Gujarat.

High-ranking officials, including Union Commerce and Industry Minister Piyush Goyal and several Gujarat state ministers, attended the signing ceremony, underlining the initiative’s importance.

Government Support and Regulatory Facilitation

To ensure timely project execution, the Government of Gujarat has pledged to provide a streamlined regulatory environment, including administrative approvals, technical clearances, and policy-driven support. This facilitation is expected to accelerate project development and strengthen investor confidence.

NLC India’s Renewable Vision to 2030

This partnership is a cornerstone of NLCIL’s “Navratna” vision, aimed at transitioning from a coal-centric enterprise to a diversified energy leader. The company plans to achieve 10 GW of renewable energy capacity by 2030.

While aggressively expanding its green footprint, NLC India faces the challenges of a transitioning energy sector. For the quarter ending September 2025, the company reported a consolidated net profit of ₹665 crore, reflecting a 27.1% decrease from ₹912 crore in the same period last year.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy Government of Gujarat green energy India News NLC India Limited renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.