Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » NTPC Approves ₹5,821 Crore BESS Investment, Expands Meja Power Project
Batteries

NTPC Approves ₹5,821 Crore BESS Investment, Expands Meja Power Project

ManshiBy ManshiMarch 30, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
NTPC Approves ₹5,821 Crore BESS Investment, Expands Meja Power Project

NTPC Ltd has approved an investment of ₹5,821.90 crore for setting up a Battery Energy Storage System (BESS) with a total capacity of 4.70 GWh, marking a significant push towards strengthening grid stability and renewable energy integration.

The goal of the large-scale storage project is to make the grid more flexible, help manage peak demand, and make sure that power is always available as more and more renewable energy comes into India.

Equity Infusion for Meja Thermal Expansion

In addition to the storage investment, NTPC’s board has approved an equity infusion of ₹3,173.67 crore in Meja Urja Nigam Private Limited (MUNPL), a 50:50 joint venture with Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL).

The investment will support the development of the Meja Super Thermal Power Project Stage-II, which will comprise three units of 800 MW each.

Increased Commitment and Project Structure

After this approval, NTPC’s total equity commitment to MUNPL will go up to ₹5,000 crore, as long as UPRVUNL makes a proportional contribution. The ownership structure will stay the same at 50:50.

MUNPL currently operates the Meja Stage-I project with a capacity of 2×660 MW and has shown consistent financial growth in recent years.

Timeline and Strategic Significance

The Meja Stage-II expansion is expected to be finished by 2029–30 and will greatly increase NTPC’s base-load generation capacity to meet the growing need for electricity.

At the same time, the BESS investment shows that NTPC is strategically diversifying into energy storage, which is important for making sure that renewable energy can be used and that the system is reliable.

Balanced Growth Strategy

The dual approvals highlight NTPC’s balanced approach simultaneously advancing clean energy transition through storage solutions while strengthening conventional thermal capacity for energy security.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS energy storage India News NTPC Ltd renewable energy thermal power project
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Leave A Reply Cancel Reply

20 + seven =

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.