Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » NTPC Commissions 13.98 MW at Khavda-I Solar Project in Gujarat
Renewable energy

NTPC Commissions 13.98 MW at Khavda-I Solar Project in Gujarat

ManshiBy ManshiDecember 31, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
NTPC Green Energy Limited has started commercial operations of 125 MW from the 500 MW Bhadla Solar PV Project in Rajasthan.

NTPC has further strengthened its renewable energy portfolio by commissioning an additional 13.98 MW of solar power capacity at its Khavda-I Solar PV Project in Gujarat. This newly commissioned capacity represents the ninth part of the 1,255 MW Khavda-I project and has been declared commercially operational with effect from 00:00 hours on 30 December 2025.

The Khavda-I Solar PV Project is being developed under the CPSU Scheme Phase-II, Tranche-III by NTPC Renewable Energy, through NTPC Green Energy Limited (NGEL), a wholly owned subsidiary of NTPC. The project forms an important component of NTPC’s strategy to significantly expand its renewable energy footprint and contribute to India’s transition toward a low-carbon and sustainable energy mix.

With the commissioning of the latest 13.98 MW capacity, the commercial capacity of the NTPC Green Energy Limited Group has increased to 7,996.30 MW. At the same time, the total installed capacity of the NGEL Group has risen to 8,010.28 MW, reflecting steady progress in scaling up clean energy assets across the country. These milestones highlight NTPC’s consistent efforts to commission renewable projects in a phased and systematic manner.

The Khavda region of Gujarat, where the project is located, has emerged as a major hub for large-scale renewable energy development in India due to its vast land availability and favorable solar conditions. NTPC continues to advance construction and grid integration at the Khavda site, commissioning capacity in phases as different segments of the project reach completion.

At the group level, the addition of this capacity has helped push NTPC’s total installed and commercial power generation capacity to 85,637 MW, reinforcing its position as India’s largest power producer. The ongoing development of the Khavda-I Solar PV Project underlines NTPC’s growing focus on renewable energy and its role as a key driver of the country’s clean energy expansion.

Through projects such as Khavda-I, NTPC aims to support national renewable energy targets while ensuring reliable and sustainable power supply across India.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy green energy India News NTPC renewable energy solar power capacity
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

Polycab India Reports 53% Revenue Growth in Q2 FY27 on Strong Cables and FMEG Performance

Polycab India Reports 53% Revenue Growth in Q2 FY27 on Strong Cables and FMEG Performance

Comments are closed.

Renewable energy

Infineon and Wolfspeed Sign Multi-Year Agreement for 200 mm SiC Wafer Supply

October 16, 2026
NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

NTPC and Africa50 Join Hands to Develop Power Generation and Cross-Border Electricity Projects in Africa

October 16, 2026
Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

Gujarat Inject (Kerala) Secures ₹6.25 Crore Solar Panel Order from Deon Energy

October 16, 2026
Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

Vikram Solar Wins 187 MW Module Supply Order for Solar Projects in Karnataka and Tamil Nadu

October 16, 2026
Batteries
Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

Wärtsilä to Deploy 35 MW/70 MWh Battery Storage System to Strengthen Aruba’s Power Grid

October 16, 2026

Changan and CATL Plan to Expand Joint Battery Manufacturing Capacity to 75 GWh

October 16, 2026
Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

Philippines Reports Normal Power Supply Outlook as DOE Advances Battery Storage Capacity

October 16, 2026
NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

NTPC Invites Bids for 15 MW Floating Solar Project with 60 MWh BESS in Mauritius

October 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.