Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » NTPC Renewable Energy Limited Floats EPC Tender for 250 MW / 1,000 MWh BESS Project at Bikaner Solar Plant
Tenders

NTPC Renewable Energy Limited Floats EPC Tender for 250 MW / 1,000 MWh BESS Project at Bikaner Solar Plant

Shweta KumariBy Shweta KumariFebruary 11, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
NTPC Renewable Energy Limited Floats EPC Tender for 250 MW / 1,000 MWh BESS Project at Bikaner Solar Plant

NTPC Renewable Energy Limited (NTPC REL) has issued an Engineering, Procurement, and Construction (EPC) tender under International Competitive Bidding (ICB) for setting up a 250 MW / 1,000 MWh Battery Energy Storage System (BESS) at its Bikaner Solar Plant in Rajasthan.

The project is designed to deliver single-cycle energy with a four-hour discharge duration, supporting grid stability and renewable energy integration in one of India’s fastest-growing solar hubs.

Project Configuration

  • Project: EPC for 1,000 MWh BESS
  • Power Rating: 250 MW
  • Discharge Duration: 4 hours (single-cycle operation)
  • Project Location: Bikaner Solar Plant, Rajasthan
  • Design Life: 25 years from Commercial Operation Date (CoD)
  • Battery Life Requirement: Minimum 10,000 operating cycles
  • Energy Capacity: 1,000 MWh (1 GWh)

Scope of Work

The EPC scope includes:

  • Design, engineering, supply, installation, testing, and commissioning of the BESS
  • Integration with existing solar power plant and grid infrastructure
  •  Comprehensive 15-year O&M, including associated warranty and service level agreements;
  •  System sizing with auxiliary consumption and reactive power compensation;
  • Minimum 10,000 charge-discharge cycles over life;
  • Guaranteed dispatchable capacity of ≥ 92 % at Point of Injection (POI) throughout the contract.

Performance Guarantees

Bidders are required to guarantee:

  • 100% rated dispatchable capacity at CoD
  • 95% dispatchable capacity in the first year
  • Minimum 92% dispatchable capacity at the Point of Interconnection (POI) across all 15 years

The performance guarantees must account for degradation consistent with daily single-cycle operation.

Eligibility Criteria (Key Highlights)

  • The bidder must have manufactured and supplied at least 80 MWh of grid-interactive BESS cumulatively
  • At least one single supply order of minimum 20 MWh must have been executed
  • The reference BESS project must have been operational for at least six months prior to techno-commercial bid opening
  • Minimum one year of experience in industrial projects outside renewables
  • At least six months of experience in renewable energy project development

Tender Timeline

  • Bidding System: Single Stage – Two Envelope (Techno-Commercial + Price Bid) followed by Reverse Auction
  • Qualifying Requirements: Proven experience in grid-interactive BESS projects with operational performance criteria specified in the IFB
  • Tender invitation date: 12 February 2026
  • Initial bid window (as per tender notice): 12–23 February 2026
  • Updated bid submission deadline (as per tender schedule/corrigendum): 11 March 2026

(Bidders are advised to track the NTPC e-tender portal for exact dates, corrigenda, and bid opening schedules.)

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
batteryenergystorage EnergyTransitionIndia GridScaleStorage India News RenewableIntegration
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

SPML Infra Reappoints Sudhanshu Shekhar Jha to Strengthen Project Execution

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Comments are closed.

Renewable energy
Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

Berde Renewables Partners With Sungrow to Deploy 500 MWh Battery Storage Across Southeast Asia

July 20, 2026
Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

Tongwei Unveils 770W Solar Module With Industry-Leading 93.07% Bifaciality

July 20, 2026
Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

Assam Unveils ₹77,353 Crore Power Infrastructure Expansion Plan

July 20, 2026
Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

Attero Secures ISO-Verified Life Cycle Assessment for Recycled Metals

July 20, 2026
Batteries
POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

POWERGRID Secures Fatehgarh-II Synchronous Condenser Project to Strengthen Grid Stability and Renewable Energy Integration

July 20, 2026
Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

Kerala Includes ISTS Benefits for RE and BESS in New Power Procurement Rules

July 20, 2026
Waaree Energies opens a 5.15 GWh BESS container production plant

Waaree Energies opens a 5.15 GWh BESS container production plant

July 17, 2026
Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

Researchers Have Developed a Unique Porous Organic Anode Material For More Efficient Lithium-Ion Batteries

July 17, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.