Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » PowerGrid Secures 2,000 MWh Battery Energy Storage Project in Andhra Pradesh
Batteries

PowerGrid Secures 2,000 MWh Battery Energy Storage Project in Andhra Pradesh

ManshiBy ManshiDecember 31, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
PowerGrid Secures 2,000 MWh Battery Energy Storage Project in Andhra Pradesh

Power Grid Corporation of India Limited (PowerGrid) has been awarded a major contract to set up a large-scale battery energy storage system (BESS) in Andhra Pradesh. The company informed stock exchanges that it was declared the successful bidder under the tariff-based competitive bidding framework, marking a critical step in strengthening grid-level energy storage in the state. The letter of award was received on December 29, 2025, formalizing the commencement of the project.

Project Capacity and Specifications

The initiative involves the development of a cumulative storage capacity of 2,000 MWh, structured as 1,000 MW with a two-hour storage duration, designed for on-demand usage. The project will be implemented under a Build-Own-Operate (BOO) model and is supported by Viability Gap Funding (VGF) through the Power System Development Fund (PSDF).

A key component of the mandate includes the establishment of a 150 MW / 300 MWh standalone BESS at the 400/220 kV sub-station at Kalikiri in Chittoor district, Andhra Pradesh. The facility will be set up at a designated APTRANSCO sub-station and is intended to enhance grid flexibility and reliability.

The BESS will play a vital role in meeting on-demand power requirements, while supporting the integration of renewable energy sources such as solar and wind into the state grid. The project aims to strengthen overall transmission infrastructure and contributes to national energy transition and grid modernization efforts.

Market Response

Despite the award, shares of PowerGrid were trading lower at ₹259.45 as of 4 PM on December 30, 2025, reflecting broader market movements or investor sentiment.

“The BESS project will play a crucial role in meeting on-demand power requirements while enhancing grid stability and reliability,” said PowerGrid, emphasizing the project’s importance for Andhra Pradesh’s energy infrastructure and its contribution to India’s larger renewable integration goals.

This award positions PowerGrid as a leader in grid-level energy storage and supports the broader development of large-scale battery storage solutions across India, reinforcing the company’s role in modernizing the power sector and enabling reliable renewable energy deployment.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery storage solutions BESS energy storage grid flexibility India News POWERGRID renewable energy VGF
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.