Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home Β» Batteries Β» Battery Manufacturing (BESS) Β» Powertrac Orders 10 GWh AI-Driven Robotic BESS Manufacturing Line in Gujarat
Battery Manufacturing (BESS)

Powertrac Orders 10 GWh AI-Driven Robotic BESS Manufacturing Line in Gujarat

Shivangi GuptaBy Shivangi GuptaSeptember 7, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Powertrac Orders 10 GWh AI-Driven Robotic BESS Manufacturing

Powertrac, an energy company with over 16 years of experience in solar PV module manufacturing, turnkey EPC, and distributed renewable energy IPP projects, is expanding into the Battery Energy Storage System (BESS) sector with plans to establish an advanced 10 GWh BESS manufacturing facility in Gujarat.
As part of the expansion, Powertrac has signed and released an order agreement with SUNKA LEAD, a China-based provider of battery-manufacturing equipment and intelligent automation solutions, for the development of the proposed BESS manufacturing production line.
this facility is being designed around a highly automated and AI-enabled manufacturing architecture, incorporating automated BESS container fabrication, AGV-based intelligent material movement, robotic assembly and handling, automated inspection and testing, quality-control systems, and integrated BESS assembly, testing and commissioning capabilities.
The BESS initiative marks a strategic expansion of Powertrac’s business from solar energy into energy storage, while leveraging its existing capabilities in EPC, renewable-energy project development and IPP operations. We also plans to address opportunities across utility-scale energy storage, commercial and industrial (C&I) energy solutions, grid stabilisation, ancillary applications and operations & maintenance services.
Powertrac currently has 480 MW of distributed renewable-energy IPP projects under signed PPAs, including projects under PM-KUSUM-C and the Gujarat DISCOM DREBP Scheme has set a target of achieving 1 GW of operational IPP capacity by 2030.
The Ordered production line is to incorporate advanced intelligent-manufacturing technologies, including AGVs, robotic material handling and assembly, automated inspection, testing and quality-control systems.
The facility is being positioned to serve emerging requirements from C&I customers, renewable-energy developers, utility-scale storage projects, grid infrastructure and broader energy-transition applications.
Powertrac’s strategic direction is to build an integrated renewable-energy and storage platform to grow
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage BESS energy storage Gujarat India News Powertrac
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

OSCAL Highlights Smart Devices and Energy Solutions at LEAP and MEE 2026

OSCAL Highlights Smart Devices and Energy Solutions at LEAP and MEE 2026

Shakeel Chouhan Elevated to Vice President – Projects at Adani Green Energy

Shakeel Chouhan Elevated to Vice President – Projects at Adani Green Energy

Sungrow, UNSW Launch AI-Powered Community Energy Project in NSW

Sungrow, UNSW Launch AI-Powered Community Energy Project in NSW

Leave A Reply Cancel Reply

2 × 3 =

Renewable energy
OSCAL Highlights Smart Devices and Energy Solutions at LEAP and MEE 2026

OSCAL Highlights Smart Devices and Energy Solutions at LEAP and MEE 2026

September 7, 2026
Shakeel Chouhan Elevated to Vice President – Projects at Adani Green Energy

Shakeel Chouhan Elevated to Vice President – Projects at Adani Green Energy

September 7, 2026
Sungrow, UNSW Launch AI-Powered Community Energy Project in NSW

Sungrow, UNSW Launch AI-Powered Community Energy Project in NSW

September 7, 2026
Sungrow Unveils New MGTL Series

Sungrow Unveils New MGTL Series for Homes and Businesses

September 7, 2026
Batteries
China Temporarily Suspends Approvals for New Battery Storage Factories

China Temporarily Suspends Approvals for New Battery Storage Factories

September 7, 2026
Kalpa Power Assigns Kamlesh Kataria as Chief Growth Officer

Kalpa Power Assigns Kamlesh Kataria as Chief Growth Officer

September 7, 2026
Powertrac Orders 10 GWh AI-Driven Robotic BESS Manufacturing

Powertrac Orders 10 GWh AI-Driven Robotic BESS Manufacturing Line in Gujarat

September 7, 2026
Equinor Brings Largest US Energy Storage Project

Equinor Brings Largest US Energy Storage Project Online

September 6, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.