Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » RSDCL Invites EoI for Battery Energy Storage Project at Bhadla Solar Park
Battery Manufacturing (BESS)

RSDCL Invites EoI for Battery Energy Storage Project at Bhadla Solar Park

PrakashBy PrakashJune 22, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
NTPC Green Energy Secures 200 MW/800 MWh BESS Capacity in West Bengal

The Rajasthan Solarpark Development Company Limited (RSDCL), a wholly owned subsidiary of the Rajasthan Renewable Energy Corporation Limited (RRECL), has invited Expressions of Interest (EoI) from developers for setting up a Battery Energy Storage System (BESS) at the Bhadla Solar Park in Rajasthan. The initiative is aimed at optimally utilising the available 680 MW grid connectivity during non-solar hours and strengthening renewable energy integration into the state’s power network.

The proposed BESS project will store surplus or curtailed renewable energy generated during peak solar hours and discharge it during evening and night periods when solar generation is not available. This is expected to enhance grid stability, improve the utilisation of transmission infrastructure, and increase the overall efficiency of the State Transmission Utility (STU) network.

Under the proposed structure, the project will be developed on a developer-owned and developer-operated model for 15 years, with the selected developer responsible for financing, designing, constructing, operating, and maintaining the facility, while retaining ownership and commercial flexibility for energy use and revenue generation.

RSDCL will facilitate the project by providing land in Bhadla Solar Park, interconnection at the 132 kV voltage level, and assistance with regulatory approvals and clearances. The project aligns with the Rajasthan Integrated Clean Energy Policy, 2024, which allows for multiple off-take options, including supply to DISCOMs, captive use, and open access.

The EoI process shall start from 18.06.2026 at 11:00 AM, and stakeholder consultation shall be held on 24.06.2026 at 14:30 Hrs at the RRECL Conference Room, Jaipur. The last date for submission of EoI responses is 14.07.2026 till 18:00 Hrs.

This process is an exploratory EoI to understand the market interest, and the same is expected to be required later at the RfP stage. No Earnest Money Deposit (EMD) or Performance Bank Guarantee (PBG) has been prescribed at this stage. However, the applicants are required to pay a non-refundable EoI document fee of ₹1,000 plus 18% GST and a processing fee of ₹5,000 plus 18% GST.

Only applicants having a positive Net Worth for FY 2025–26, certified by a statutory auditor, will be eligible for the application. They are also required to propose BESS configurations such as 2-hour, 4-hour, or 6-hour storage durations and a proposed energy sharing or revenue sharing model with RSDCL. The submissions can be made online or offline to the designated Project Manager Deepak Sharma at the RSDCL office, Jaipur.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS BESS project Expressions of Interest India News RSDCL
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Waaree Renewable Wins EPC Order for 291 MWp Solar

Waaree Renewable Wins EPC Order for 291 MWp Solar and 280 MWh BESS Project

Sachin Sehgal Joins Adani Power as Head of Administration

Sachin Sehgal Joins Adani Power as Head of Administration, Brings Extensive Operations Expertise

Livguard Strengthens Kashmir Presence

Livguard Strengthens Kashmir Presence with First Exclusive Brand Outlet in Anantnag

Leave A Reply Cancel Reply

1 × two =

Renewable energy
Waaree Renewable Wins EPC Order for 291 MWp Solar

Waaree Renewable Wins EPC Order for 291 MWp Solar and 280 MWh BESS Project

August 31, 2026
Sachin Sehgal Joins Adani Power as Head of Administration

Sachin Sehgal Joins Adani Power as Head of Administration, Brings Extensive Operations Expertise

August 31, 2026
Livguard Strengthens Kashmir Presence

Livguard Strengthens Kashmir Presence with First Exclusive Brand Outlet in Anantnag

August 31, 2026
Tata Power Renewables Crosses 7 GW Operational Capacity

Tata Power Renewables Crosses 7 GW Operational Capacity with 100 MW Kayathar Solar Project

August 31, 2026
Batteries
Copenhagen Infrastructure Partners Expands Australian Portfolio

Copenhagen Infrastructure Partners Expands Australian Portfolio with Wind and Battery Project Acquisition

August 31, 2026
KP Green Engineering Secures rs258 Crore

KP Green Engineering Secures ₹258 Crore Orders as KPI Green Energy Accelerates Solar, Wind and BESS Expansion

August 31, 2026
SECI Floats Tender for 50 MW/100 MWh Standalone BESS

SECI Floats Tender for 50 MW/100 MWh Standalone BESS on Short-Term Basis

August 31, 2026
CATL Unveils Local Partnership

CATL Unveils Local Partnership and Full-Chain Energy Storage Solutions in South America

August 29, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.