Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » RSDCL Invites EoI for Battery Energy Storage Project at Bhadla Solar Park
Battery Manufacturing (BESS)

RSDCL Invites EoI for Battery Energy Storage Project at Bhadla Solar Park

PrakashBy PrakashJune 22, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
RSDCL Invites EoI for Battery Energy Storage Project at Bhadla Solar Park

The Rajasthan Solarpark Development Company Limited (RSDCL), a wholly owned subsidiary of the Rajasthan Renewable Energy Corporation Limited (RRECL), has invited Expressions of Interest (EoI) from developers for setting up a Battery Energy Storage System (BESS) at the Bhadla Solar Park in Rajasthan. The initiative is aimed at optimally utilising the available 680 MW grid connectivity during non-solar hours and strengthening renewable energy integration into the state’s power network.

The proposed BESS project will store surplus or curtailed renewable energy generated during peak solar hours and discharge it during evening and night periods when solar generation is not available. This is expected to enhance grid stability, improve the utilisation of transmission infrastructure, and increase the overall efficiency of the State Transmission Utility (STU) network.

Under the proposed structure, the project will be developed on a developer-owned and developer-operated model for 15 years, with the selected developer responsible for financing, designing, constructing, operating, and maintaining the facility, while retaining ownership and commercial flexibility for energy use and revenue generation.

RSDCL will facilitate the project by providing land in Bhadla Solar Park, interconnection at the 132 kV voltage level, and assistance with regulatory approvals and clearances. The project aligns with the Rajasthan Integrated Clean Energy Policy, 2024, which allows for multiple off-take options, including supply to DISCOMs, captive use, and open access.

The EoI process shall start from 18.06.2026 at 11:00 AM, and stakeholder consultation shall be held on 24.06.2026 at 14:30 Hrs at the RRECL Conference Room, Jaipur. The last date for submission of EoI responses is 14.07.2026 till 18:00 Hrs.

This process is an exploratory EoI to understand the market interest, and the same is expected to be required later at the RfP stage. No Earnest Money Deposit (EMD) or Performance Bank Guarantee (PBG) has been prescribed at this stage. However, the applicants are required to pay a non-refundable EoI document fee of ₹1,000 plus 18% GST and a processing fee of ₹5,000 plus 18% GST.

Only applicants having a positive Net Worth for FY 2025–26, certified by a statutory auditor, will be eligible for the application. They are also required to propose BESS configurations such as 2-hour, 4-hour, or 6-hour storage durations and a proposed energy sharing or revenue sharing model with RSDCL. The submissions can be made online or offline to the designated Project Manager Deepak Sharma at the RSDCL office, Jaipur.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS BESS project Expressions of Interest India News RSDCL
Prakash
  • Website
  • LinkedIn

I am a Junior Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

OUKITEL Unveils Next-Gen EP2500 Balcony Energy Storage System at Intersolar Europe 2026

OUKITEL Unveils Next-Gen EP2500 Balcony Energy Storage System at Intersolar Europe 2026

MEDA Invites Bids

MEDA Invites Bids for ₹17.51 Crore Solar Microgrid Projects with Battery Storage in Amravati

Entrix

Entrix to Optimise DRI’s 133-MW Battery Energy Storage Project in Poland

Leave A Reply Cancel Reply

sixteen + 2 =

Renewable energy
OUKITEL Unveils Next-Gen EP2500 Balcony Energy Storage System at Intersolar Europe 2026

OUKITEL Unveils Next-Gen EP2500 Balcony Energy Storage System at Intersolar Europe 2026

June 22, 2026
Renewable Energy Project

₹6,000 Crore Renewable Energy Project Among ₹30,515 Crore Investment Proposals Cleared by Andhra Pradesh SIPB

June 22, 2026
Auneesh Chandra Shukla

ACME Solar Appoints Auneesh Chandra Shukla as General Manager – Construction Head (ISTS-BESS)

June 22, 2026
Ciju K Raj

SWELECT Energy Appoints Ciju K Raj as Assistant Vice President – Channels

June 22, 2026
Batteries
MEDA Invites Bids

MEDA Invites Bids for ₹17.51 Crore Solar Microgrid Projects with Battery Storage in Amravati

June 22, 2026
Entrix

Entrix to Optimise DRI’s 133-MW Battery Energy Storage Project in Poland

June 22, 2026
RSDCL Invites EoI for Battery Energy Storage Project at Bhadla Solar Park

RSDCL Invites EoI for Battery Energy Storage Project at Bhadla Solar Park

June 22, 2026
Siemens Mobility

Siemens Mobility to Maintain 61 Battery-Electric Mireo Plus B Trains for North Westphalia Under Long-Term Service Deal

June 22, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.