Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Scatec starts construction of large scale solar and battery storage project in Egypt
Batteries

Scatec starts construction of large scale solar and battery storage project in Egypt

Shweta KumariBy Shweta KumariMay 6, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Scatec starts construction of solar & battery storage project

Scatec ASA has commenced construction of its 1.1 GW Obelisk solar and 100 MW/200 MWh battery storage project in Egypt. The energy will be sold under a USD-denominated 25-year Power Purchase Agreement (PPA) with the Egyptian Electricity Transmission Company (EETC), backed by a sovereign guarantee.

The project will be constructed in two phases. The first phase of 561 MW solar + 100 MW/200 MWh battery storage is targeted to reach commercial operational date (COD) in the first half of 2026 and the second phase of 564 MW solar in the second half of 2026.

Scatec has also signed equity bridge loans (EBL) of USD 120 million for the project, postponing the project equity injections to the end of the construction period. A USD 90 million EBL will be provided by The Arab Energy Fund with maturity in the second quarter 2028 and another USD 30 million EBL by the European Bank for Reconstruction and Development (EBRD) with maturity in the first quarter 2027.

Scatec has further signed a mandate letter with a consortium of development finance institutions for the long-term non-recourse project debt at attractive terms, with financial close expected in the next few months. The company is also in advanced discussions with potential equity partners, expected to conclude in the same timeframe.

“We are proud to break ground on Egypt’s first hybrid solar and battery project, building on our proven track record with similar developments. Egypt has ambitious targets to build out significant renewable energy capacity the coming years, and this milestone further strengthens Scatec’s position as a leading renewable energy producer in the country,” says Scatec CEO Terje Pilskog.

Total capex for the project is approximately USD 590 million to be partly financed by a targeted 80% non-recourse long-term project debt. Scatec will deliver Engineering, Procurement and Construction (EPC), Asset Management (AM), and Operations & Maintenance (O&M) services for the project. Scatec’s EPC scope is approximately 70% of total capex, reduced from previous communication due to optimisation of the EPC structure but with unchanged gross profit to Scatec.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery storage project energy storage power purchase agreement Scatec ASA
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

Comments are closed.

Renewable energy
India intends to Mandatory 2-hour battery storage

India intends to Mandatory 2-hour battery storage for new wind and solar installations

September 4, 2026
JA Expands Solar-Plus-Storage Solutions Across Europe

JA Expands Solar-Plus-Storage Solutions Across Europe

September 4, 2026
JSW Energy Crosses 15 GW Capacity Milestone

JSW Energy Crosses 15 GW Capacity Milestone, Adds 1,572 MW in FY27

September 4, 2026
SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack

SPML Infra Marks BESS Milestone as Indigenous 104.4 kWh Battery Pack Clears Global Tests

September 4, 2026
Batteries
TCL Takes Its Energy Vision from Industry to Home

TCL Takes Its Energy Vision from Industry to Home at IFA 2026

September 4, 2026
Chery Set to Begin Solid-State Battery

Chery Set to Begin Solid-State Battery Road Tests in 2027

September 3, 2026
Hoymiles is Ready to Power the UK's New Plug-in Solar Era

Hoymiles Supports UK’s New Plug-in Solar Era with DIY Solar Solutions

September 3, 2026
Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO

Cosmic PV Power Clears SEBI Hurdle for Rs 640 Crore IPO, Plans 1.1 GW TOPCon Cell Plant

September 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.