Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » SECI Issues Tender for Internet Connectivity at 10 MW Solar Project in Rajasthan
Tenders

SECI Issues Tender for Internet Connectivity at 10 MW Solar Project in Rajasthan

ManshiBy ManshiApril 10, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
SECI Issues Tender for Internet Connectivity at 10 MW Solar Project in Rajasthan

The Solar Energy Corporation of India (SECI) has issued a tender inviting bids for internet connectivity services at its 10 MW solar power project located in Badi Sid, Jodhpur, Rajasthan. The tender focuses on providing reliable leased line connectivity to support the operational and monitoring requirements of the solar installation.

According to the tender details, the chosen bidder will be in charge of providing dedicated internet leased line services for five years. The connection will be very important for smooth data transfer, remote monitoring, and smooth plant operations.

Supporting Digital Infrastructure for Solar Operations

The initiative highlights the growing importance of digital infrastructure in renewable energy projects. Stable and high-speed internet connectivity is essential for real-time performance monitoring, data analytics, and integration with grid management systems.

The work includes setting up, starting up, and keeping up the internet connection system for the whole time of the contract. The service provider will also have to keep service quality standards high and make sure that there is as little downtime as possible to keep plant operations running smoothly.

Focus on Reliability and Long-Term Service Delivery

SECI’s tender outlines the requirement for a robust and secure connectivity solution tailored to the needs of utility-scale solar projects. The leased line service is expected to ensure consistent bandwidth availability and low latency, which are crucial for operational efficiency and system reliability.

The five-year contract duration reflects SECI’s focus on long-term service stability and operational continuity. By ensuring dependable communication infrastructure, the project aims to enhance overall performance and support efficient energy generation.

Strengthening Renewable Energy Ecosystem

This development underscores SECI’s continued efforts to strengthen the operational backbone of solar projects through advanced infrastructure support. As renewable energy installations grow in scale and complexity, the role of digital connectivity becomes increasingly vital.

The SECI tender for Internet Connectivity also gives telecom and network service providers a chance to get involved in India’s growing renewable energy sector. SECI wants to improve plant performance even more by adding reliable connectivity solutions. This will help India reach its larger goal of strengthening its clean energy ecosystem.

The move reinforces the importance of combining energy generation with digital capabilities to enable smarter, more efficient renewable energy operations.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
India News renewable energy projects SECI solar installation Solar Power Project solar projects
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

GRIDCO Invites Bids for ESIA Consultancy for 225 MW Floating Solar and BESS Project in Odisha

GRIDCO Invites Bids for ESIA Consultancy for 225 MW Floating Solar and BESS Project in Odisha

Luminous Solar Celebrates the Spirit of Durga Puja with 'Alo’r Alpona'

Luminous Solar Celebrates the Spirit of Durga Puja with ‘Alo’r Alpona’

Leave A Reply Cancel Reply

12 + 13 =

Renewable energy
GRIDCO Invites Bids for ESIA Consultancy for 225 MW Floating Solar and BESS Project in Odisha

GRIDCO Invites Bids for ESIA Consultancy for 225 MW Floating Solar and BESS Project in Odisha

October 19, 2026
Luminous Solar Celebrates the Spirit of Durga Puja with 'Alo’r Alpona'

Luminous Solar Celebrates the Spirit of Durga Puja with ‘Alo’r Alpona’

October 19, 2026
Greenzo Energy Raises ₹251 Crore Across Funding Rounds to Expand Green Hydrogen Business

Greenzo Energy Raises ₹251 Crore Across Funding Rounds to Expand Green Hydrogen Business

October 19, 2026
Juniper Green Energy Commissions 65.40 MW Wind Capacity Under 200 MW FDRE Project

Juniper Green Energy Commissions 65.40 MW Wind Capacity Under 200 MW FDRE Project

October 19, 2026
Batteries
Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

October 19, 2026

Smartgrid Analytics to Introduce Solvyn AURA at REI Expo 2026 to Power India’s Intelligent Energy Infrastructure Amid 12x Data Centre Growth by 2036

October 19, 2026
ACME Solar Signs Agreement With SECI for 300 MW Firm Renewable Power at ₹6 per Unit

ACME Solar Signs Agreement With SECI for 300 MW Firm Renewable Power at ₹6 per Unit

October 19, 2026
Solis Marks 10 Years in India With 10 GW in Cumulative Shipments, Expands Into Energy Storage

Solis Marks 10 Years in India With 10 GW in Cumulative Shipments, Expands Into Energy Storage

October 19, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.