Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Senvion India Wins 83.7 MW Wind Project Contract from Tata Power Renewables in Tamil Nadu
Renewable energy

Senvion India Wins 83.7 MW Wind Project Contract from Tata Power Renewables in Tamil Nadu

ManshiBy ManshiFebruary 24, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Senvion India Wins 83.7 MW Wind Project Contract from Tata Power Renewables in Tamil Nadu

Senvion India has secured a new wind power contract worth 83.7 MW from Tata Power Renewable Energy Limited (TPREL) for a project to be developed in the Indian state of Tamil Nadu, the company announced today.

Order Details and Turbine Deployment

Under the agreement, Senvion India will supply and install 31 of its 2.7M130 wind turbine generators, all of which will operate at a 130-metre hub height. The turbines combine a large rotor design with advanced controls, making them particularly suitable for independent power producers (IPPs) seeking long-term, reliable performance.

In addition to the installation, Senvion will undertake operations and maintenance (O&M) for up to 25 years, ensuring continuous performance oversight throughout the project’s lifecycle.

Certified Site Execution and Monitoring

The wind farm will be constructed on a Senvion Certified Site a location that has already undergone detailed assessments including wind measurement, layout planning, logistics evaluation, land feasibility studies, and grid preparedness checks. According to the company, this certification minimizes early project risk and enables faster decision-making for customers like Tata Power Renewables.

Once commissioned, the project will be monitored using Senvion’s proprietary digital platform FleetPro™, which provides remote diagnostics, performance analytics, and planned intervention capabilities. The system is designed to help maximise turbine availability and overall operational efficiency throughout its lifespan.

Leadership Comments

Amit Kansal, CEO and Managing Director of Senvion India, highlighted the strength of the ongoing partnership:

“We’re delighted to continue our partnership with TPREL. The Certified Sites approach has allowed both teams to start from a position of confidence, with feasibility checks, wind assessments, and site readiness already in place. With the 2.7M130 platform and long-term O&M commitment, our focus is simple: reliable delivery from day one and consistent performance throughout the life of the project.”

Senvion India has been operating in the Indian market since 2016, with manufacturing capacity of 2 GW and an operational wind portfolio exceeding 1.5 GW nationwide.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
India News Senvion India Tata Power TPREL Wind Power Contract
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

Comments are closed.

Renewable energy
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

KPI Green Commissions 200 MW Solar Capacity, Secures Charging Approval for 100 MW MAHAGENCO Project

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Batteries
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026
Delectrik 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India Delectrik’s 3 MWH Vanadium Redox Flow Battery Installation at Greater Noida, India

Delectrik to Deploy India’s First 100 MWh Utility-Scale Vanadium Flow Battery

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.